Fonte: ANEEL
The public hearing No. 84/2012 aiming to improve the criteria for calculating the accurate physical guarantee of hydroelectric and inflexible thermoelectric plant with null Variable Cost per Unit (VCU)* started today (October 11th ). The hearing was approved during the last public meeting of the board of ANEEL held on Tuesday (October 9th ).
The technical note on the Agency's proposal and the minute of the resolution on the topic are available on the ANEEL website at: (www.aneel.gov.br) , on link audiências 2012.
Contributions may be sent to the audience via email (ap084_2012@aneel.gov.br) by November 12th this year via fax: (61) 2192-8839 or to the mailing address of the Agency (SGAN, Quadra 603, Módulo I, Térreo, Protocolo Geral, CEP: 70.830-030), em Brasília (DF). (DB/PG)
* Variable Cost per Unit – Value expressed in Brazilian Reais per megawatt-hour (£ / MWh) as calculated by EPE (Empresa de Pesquisa Energética ) based on parameters reported by the bidder before the auction, limited to fifty percent of the maximum value of Difference Settlement Price (Preço de Liquidação de Diferenças – PLD) as established in Ordinance No. 043, of March 1, 2007. The value serves as a basis for definition of the physical guarantee, the expected values of Operating Cost and the Short-Term Economic Cost, necessary to cover all operating costs of the project, except those already covered by fixed revenue. Portaria MME n. 120, de 13 de junho de 2007 (Diário Oficial, de 14 jun. 2007, seção 1, p. 54)