{"id":14145,"date":"2008-05-23T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-2570","status":"publish","type":"post","link":"https:\/\/sindenergia.com.br\/seminario\/?p=14145","title":{"rendered":"Pr\u00e9-qualificadas 31 empresas para o leil\u00e3o de linhas de transmiss\u00e3o em junho"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=2570&#038;id_area=90'><b>ANEEL<\/b><\/a><\/p>\n<p align='justify'><font face='Verdana, Helvetica' size='2'>A Comiss\u00e3o Especial de Licita\u00e7\u00e3o da Aneel divulgou hoje (23\/05) no Di\u00e1rio Oficial da Uni\u00e3o a lista das empresas pr\u00e9-qualificadas para participar do leil\u00e3o de concess\u00f5es de 19 linhas de transmiss\u00e3o e 20 subesta\u00e7\u00f5es que a Ag\u00eancia realizar\u00e1 no dia 27 de junho, na Bolsa de Valores do Rio de Janeiro. Na rela\u00e7\u00e3o, 31 empresas, individualmente, e oito cons\u00f3rcios que atenderam a documenta\u00e7\u00e3o exigida no edital. A pr\u00f3xima etapa \u00e9 o recolhimento da garantia de proposta no dia 26 de junho at\u00e9 \u00e0s 14h, na Companhia Brasileira de Liquida\u00e7\u00e3o e Cust\u00f3dia (CBLC) em S\u00e3o Paulo<b>.<\/b><\/font><\/p>\n<p align='justify'><font face='Verdana, Helvetica' size='2'>No \u00faltimo dia 12 de maio, 32 empresas e oito cons\u00f3rcios entregaram a documenta\u00e7\u00e3o necess\u00e1ria para a pr\u00e9-qualifica\u00e7\u00e3o. Em conseq\u00fc\u00eancia do descumprimento de exig\u00eancias do edital de licita\u00e7\u00e3o, uma empresa foi desqualificada pela Comiss\u00e3o Especial de Licita\u00e7\u00e3o. A empresa Delta Constru\u00e7\u00f5es S\/A n\u00e3o poder\u00e1 concorrer no lote F.&#160;<\/font><\/p>\n<p align='justify'><font face='Verdana, Helvetica' size='2'>Somadas, as linhas ir\u00e3o adicionar 3 mil quil\u00f4metros \u00e0 Rede B\u00e1sica do Sistema Interligado Nacional (SIN) e ser\u00e3o constru\u00eddas em 12 estados: Amap\u00e1, Amazonas, Bahia, Goi\u00e1s, Mato Grosso, Minas Gerais, Par\u00e1, Paran\u00e1, Rio de Janeiro, Rio Grande do Sul, Santa Catarina e S\u00e3o Paulo. Os prazos para a entrada em opera\u00e7\u00e3o v\u00e3o de 15 a 36 meses, a partir da assinatura dos contratos de concess\u00e3o. Os investimentos totais s\u00e3o estimados em R$ 2,86 bilh\u00f5es. A implanta\u00e7\u00e3o dos empreendimentos possibilitar\u00e1 a gera\u00e7\u00e3o de 28,6 mil empregos diretos.<\/font><\/p>\n<p align='justify'><font face='Verdana, Helvetica' size='2'>Veja a rela\u00e7\u00e3o, por lote, das empresas e dos cons\u00f3rcios pr\u00e9-qualificados.<\/font><b><font face='Verdana, Helvetica' size='2'>&#160;<\/font><\/b><\/p>\n<p align='center'><b>&#160;<\/b><\/p>\n<p><b><font face='Verdana, Helvetica' size='2'>LOTE A<\/font><\/b><\/p>\n<table cellspacing='1' cellpadding='4' width='581' border='1'>\n<tbody>\n<tr>\n<td width='65%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Empreendimento<\/font><\/b><\/p>\n<\/td>\n<td width='16%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Tens\u00e3o (kV)<\/font><\/b><\/p>\n<\/td>\n<td width='19%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Extens\u00e3o aproximada (km)<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='65%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Tucuru\u00ed &#8211; Xingu (PA)<\/font><\/p>\n<\/td>\n<td width='16%'>\n<p><font face='Verdana, Helvetica' size='2'>500<\/font><\/p>\n<\/td>\n<td width='19%'>\n<p><font face='Verdana, Helvetica' size='2'>264<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='65%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Xingu &#8211; Jurupari (PA)<\/font><\/p>\n<\/td>\n<td width='16%'>\n<p><font face='Verdana, Helvetica' size='2'>500<\/font><\/p>\n<\/td>\n<td width='19%'>\n<p><font face='Verdana, Helvetica' size='2'>263<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='65%' height='13'>\n<p><font face='Verdana, Helvetica' size='2'>SE Xingu (PA)<\/font><\/p>\n<\/td>\n<td width='16%' height='13'>\n<p><font face='Verdana, Helvetica' size='2'>500<\/font><\/p>\n<\/td>\n<td width='19%' height='13'>\n<p><b><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='65%' height='19'>\n<p><font face='Verdana, Helvetica' size='2'>SE Jurupari (PA)<\/font><\/p>\n<\/td>\n<td width='16%' height='19'>\n<p><font face='Verdana, Helvetica' size='2'>500\/230<\/font><\/p>\n<\/td>\n<td width='19%' height='19'>\n<p><b><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='65%' height='22'><\/td>\n<td width='16%' height='22'>\n<p><b><font face='Verdana, Helvetica' size='2'>Total<\/font><\/b><\/p>\n<\/td>\n<td width='19%' height='22'>\n<p><b><font face='Verdana, Helvetica' size='2'>527<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><font face='Verdana, Helvetica' size='2'>1) Isolux Ingenieria S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>2) Schahin Engenharia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>3) Abengoa Constru\u00e7\u00e3o Brasil Ltda. (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>4) Integra\u00e7\u00e3o Transmissora de Energia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>5) TPI Triunfo Participa\u00e7\u00f5es e Investimentos S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>6) Cons\u00f3rcio Amazonas (Centrais El\u00e9tricas do Norte do Brasil S\/A &#8211; Eletronorte &#8211; 30%; Companhia Hidroel\u00e9trica do S\u00e3o Francisco &#8211; Chesf &#8211; 19,5%; Abengoa Concess\u00f5es Brasil Holding S\/A &#8211; 30%; Fundo de Investimentos em Participa\u00e7\u00f5es Brasil Energia &#8211; 20,5%) (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>7) Cons\u00f3rcio Trans-Manaus (Alupar Investimento S\/A &#8211; 25%; Cymi Holding S\/A &#8211; 25%; Elecnor S\/A &#8211; 25%; CTEEP &#8211; Companhia de Transmiss\u00e3o de Energia El\u00e9trica Paulista &#8211; 25%) (Brasil)<\/font><\/p>\n<p><b><font face='Verdana, Helvetica' size='2'>LOTE B<\/font><\/b><\/p>\n<table cellspacing='1' cellpadding='4' width='581' border='1'>\n<tbody>\n<tr>\n<td width='55%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Empreendimento<\/font><\/b><\/p>\n<\/td>\n<td width='18%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Tens\u00e3o (kV)<\/font><\/b><\/p>\n<\/td>\n<td width='27%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Extens\u00e3o aproximada (km)<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Oriximin\u00e1 &#8211; Jurupari (PA)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>500<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>374<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Jurupari (PA) &#8211; Laranjal (AP)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>95<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Laranjal &#8211; Macap\u00e1 (AP)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>244<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Macap\u00e1 (AP)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>230\/69<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Laranjal (AP)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>230\/69<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Oriximin\u00e1 (PA)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>500-138<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'><font face='Verdana, Helvetica' size='2'>&#160;<\/font> <\/td>\n<td width='18%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Total<\/font><\/b><\/p>\n<\/td>\n<td width='27%'>\n<p><b><font face='Verdana, Helvetica' size='2'>713<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><font face='Verdana, Helvetica' size='2'>1) Isolux Ingenieria S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>2) Orteng Equipamentos e Sistemas Ltda. (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>3) Schahin Engenharia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>4) Abengoa Constru\u00e7\u00e3o Brasil Ltda. (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>5) Integra\u00e7\u00e3o Transmissora de Energia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>6) TPI Triunfo Participa\u00e7\u00f5es e Investimentos S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>7) Cons\u00f3rcio Amazonas (Centrais El\u00e9tricas do Norte do Brasil S\/A &#8211; Eletronorte &#8211; 30%; Companhia Hidroel\u00e9trica do S\u00e3o Francisco &#8211; Chesf &#8211; 19,5%; Abengoa Concess\u00f5es Brasil Holding S\/A &#8211; 30%; Fundo de Investimentos em Participa\u00e7\u00f5es Brasil Energia &#8211; 20,5%) (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>8) Cons\u00f3rcio Solim\u00f5es (Alupar Investimento S\/A &#8211; 25%; Cobra Instalaciones y Servicios S\/A &#8211; 25%; Elecnor S\/A &#8211; 25%; CTEEP &#8211; Companhia de Transmiss\u00e3o de Energia El\u00e9trica Paulista &#8211; 25%) (Brasil)<\/font><\/p>\n<p><b><font face='Verdana, Helvetica' size='2'>LOTE C<\/font><\/b><\/p>\n<table cellspacing='1' cellpadding='4' width='581' border='1'>\n<tbody>\n<tr>\n<td width='55%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Empreendimento<\/font><\/b><\/p>\n<\/td>\n<td width='18%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Tens\u00e3o (kV)<\/font><\/b><\/p>\n<\/td>\n<td width='27%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Extens\u00e3o aproximada (km)<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Oriximin\u00e1 (PA) &#8211; Itacoatiara (AM)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>500<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>374<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Itacoatiara &#8211; Cariri (AM)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>500<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>212<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Itacoatiara (AM)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>500\/138<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Cariri (AM)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>500\/230<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%' height='32'><\/td>\n<td width='18%' height='32'>\n<p><b><font face='Verdana, Helvetica' size='2'>Total<\/font><\/b><\/p>\n<\/td>\n<td width='27%' height='32'>\n<p><b><font face='Verdana, Helvetica' size='2'>586<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><font face='Verdana, Helvetica' size='2'>1) Isolux Ingenieria S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>2) Schahin Engenharia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>3) Abengoa Constru\u00e7\u00e3o Brasil Ltda. (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>4) TPI Triunfo Participa\u00e7\u00f5es e Investimentos S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>5) Cons\u00f3rcio Amazonas (Centrais El\u00e9tricas do Norte do Brasil S\/A &#8211; Eletronorte &#8211; 30%; Companhia Hidroel\u00e9trica do S\u00e3o Francisco &#8211; Chesf &#8211; 19,5%; Abengoa Concess\u00f5es Brasil Holding S\/A &#8211; 30%; Fundo de Investimentos em Participa\u00e7\u00f5es Brasil Energia &#8211; 20,5%) (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>6) Cons\u00f3rcio Solim\u00f5es (Alupar Investimento S\/A &#8211; 25%; Cobra Instalaciones y Servicios S\/A &#8211; 25%; Elecnor S\/A &#8211; 25%; CTEEP &#8211; de Transmiss\u00e3o de Energia El\u00e9trica Paulista &#8211; 25%) (Brasil)<\/font><\/p>\n<p><b><font face='Verdana, Helvetica' size='2'>LOTE D<\/font><\/b><\/p>\n<table cellspacing='1' cellpadding='4' width='595' border='1'>\n<tbody>\n<tr>\n<td width='54%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Empreendimento<\/font><\/b><\/p>\n<\/td>\n<td width='20%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Tens\u00e3o (kV)<\/font><\/b><\/p>\n<\/td>\n<td width='26%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Extens\u00e3o aproximada (km)<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='54%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Maggi &#8211; Juba (MT)<\/font><\/p>\n<\/td>\n<td width='20%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='26%'>\n<p><font face='Verdana, Helvetica' size='2'>232<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='54%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Parecis &#8211; Maggi (MT)<\/font><\/p>\n<\/td>\n<td width='20%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='26%'>\n<p><font face='Verdana, Helvetica' size='2'>106<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='54%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Ju\u00edna &#8211; Maggi (MT)<\/font><\/p>\n<\/td>\n<td width='20%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='26%'>\n<p><font face='Verdana, Helvetica' size='2'>215<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='54%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Nova Mutum &#8211; Sorriso (MT)<\/font><\/p>\n<\/td>\n<td width='20%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='26%'>\n<p><font face='Verdana, Helvetica' size='2'>145<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='54%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Sorriso &#8211; Sinop (MT)<\/font><\/p>\n<\/td>\n<td width='20%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='26%'>\n<p><font face='Verdana, Helvetica' size='2'>77<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='54%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Parecis<\/font><\/p>\n<\/td>\n<td width='20%'>\n<p><font face='Verdana, Helvetica' size='2'>230\/138\/13,8<\/font><\/p>\n<\/td>\n<td width='26%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='54%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Ju\u00edna<\/font><\/p>\n<\/td>\n<td width='20%'>\n<p><font face='Verdana, Helvetica' size='2'>230\/138\/13,8<\/font><\/p>\n<\/td>\n<td width='26%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='54%'><font face='Verdana, Helvetica' size='2'>&#160;<\/font> <\/td>\n<td width='20%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Total<\/font><\/b><\/p>\n<\/td>\n<td width='26%'>\n<p><b><font face='Verdana, Helvetica' size='2'>775<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><font face='Verdana, Helvetica' size='2'>1) Orteng Equipamentos e Sistemas Ltda. (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>2) Schahin Engenharia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>3) Abengoa Concess\u00f5es Brasil Holding S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>4) Isolux Ingenieria S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>5) Elecnor Transmiss\u00e3o de Energia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>6) Elecnor S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>7) Cymi Holding S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>8) CTEEP &#8211; de Transmiss\u00e3o de Energia El\u00e9trica Paulista (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>9) Cobra Instalaciones y Servicios S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>10) Abengoa Constru\u00e7\u00e3o Brasil Ltda. (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>11) Abengoa S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>12) Alupar Investimento S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>13) Cons\u00f3rcio Neoenergia &#8211; Odebrecht (Neoenergia S\/A &#8211; 51%; Odebrecht Investimentos em Infra-Estrutura Ltda. 45%; Construtora Norberto Odebrecht S\/A &#8211; 4%) (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>14) Cons\u00f3rcio Linha Verde (Centrais El\u00e9tricas do Norte do Brasil S\/A &#8211; Eletronorte &#8211; 45%; Bimetal Ind\u00fastria Metal\u00fargica Ltda. &#8211; 20%; Terna Participa\u00e7\u00f5es S\/A &#8211; 35%) (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>15) Cons\u00f3rcio TBE Centro-Oeste (Empresa Amazonense de Transmiss\u00e3o de Energia S\/A &#8211; 51%; Cemig Gera\u00e7\u00e3o e Transmiss\u00e3o S\/A &#8211; 49%) (Brasil)<\/font><\/p>\n<div >\n<p><b><font face='Verdana, Helvetica' size='2'>LOTE E<\/font><\/b><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL A Comiss\u00e3o Especial de Licita\u00e7\u00e3o da Aneel divulgou hoje (23\/05) no Di\u00e1rio Oficial da Uni\u00e3o a lista das empresas pr\u00e9-qualificadas para participar do leil\u00e3o de concess\u00f5es de 19 linhas de transmiss\u00e3o e 20 subesta\u00e7\u00f5es que a Ag\u00eancia realizar\u00e1 no dia 27 de junho, na Bolsa de Valores do Rio de Janeiro. Na rela\u00e7\u00e3o, [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/14145"}],"collection":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=14145"}],"version-history":[{"count":0,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/14145\/revisions"}],"wp:attachment":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=14145"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=14145"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=14145"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}