{"id":14081,"date":"2008-06-26T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-2634","status":"publish","type":"post","link":"https:\/\/sindenergia.com.br\/seminario\/?p=14081","title":{"rendered":"Concessions of new transmission lines will be disputed by 27 participants"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=2634&#038;id_area=90'><b>ANEEL<\/b><\/a><\/p>\n<p  >Companies from Brazil and Spain confirmed participation in the auction of concession of 19 transmission lines and 20 substations that the Brazilian Electricity Regulatory Agency (Aneel) will hold tomorrow (06\/27) at <st1:metricconverter w:st='on' ProductID='10 a'>10 a<\/st1:metricconverter>.m., in Rio de Janeiro, in a public session lead by the S\u00e3o Paulo Stock Market (Bovespa). The 12 lots offered will be disputed by the 27 companies, which participant individually or are integrants of the 8 qualified consortiums.<\/p>\n<p>The right to dispute the concessions was confirmed today (06\/26) after the deposit of proposal guarantees at the Brazilian Company of Settlement and Custody (CBLC), in <st1:City w:st='on'><st1:place w:st='on'>S\u00e3o Paulo<\/st1:place><\/st1:City>. In the group of 27 qualified participants for the auction, 24 are national and three are Spanish.<\/p>\n<p>Of the 31 pre-qualified companies, four will not participate individually of the auction due to not having furnished guaranteed for any of the lots. They are: Abengoa Constru\u00e7\u00e3o Brasil Ltda., Abengoa S\/A, Integra\u00e7\u00e3o Transmissora de Energia S\/A and Engevix Engenharia S\/A.<\/p>\n<p>All the s consortiums are apt for the dispute. Schahin Engenharia S\/A didn&#8217;t furnish guarantees in lots A, E, H, J and K, but participates in lots B, D, F, I and L. TPI Triunfo Participa\u00e7\u00f5es e Investimentos S\/A is out of the dispute in lots A, B, C, E, H, J and K, but participates in the dispute for lots F, I and L. The company Elecnor S\/A did not deposit guarantees in lots D, E, F, G, H, I, J, K and L, but is in the dispute integrating consortiums. Terna Participa\u00e7\u00f5es S\/A will not compete in lots E, F, H, J and K, however it madde the deposits to compete in lots G, I and L.<\/p>\n<p>The concessions that will be auctioned designated to the building, operation and maintenance of approximately 3 thousand kilometers of new transmission lines of the basic network to be built in 12 states: Amap\u00e1, Amazonas, Bahia, Goi\u00e1s, Mato Grosso, Minas Gerais, Par\u00e1, Paran\u00e1, <st1:City w:st='on'>Rio de Janeiro<\/st1:City>, <st1:City w:st='on'>Rio Grande<\/st1:City> do Sul, Santa Catarina and <st1:City w:st='on'><st1:place w:st='on'>S\u00e3o Paulo<\/st1:place><\/st1:City>. The enterprises will go into operation within deadlines that vary from 15 to 36 months, after the signing of the concession contracts. The necessary investments were estimated at R$ 2.86 billion.<\/p>\n<p>The new lines will reinforce the transmission capacity of the National Interconnected System (SIN) and allow for the generation of approximately 28.6 thousand direct jobs in the North, Northeast, Mid-West and South regions.<\/p>\n<p>By the auction standards, those who offer the lowest tariff, or in other words, the lowest Allowed Annual Revenue (RAP) for the transmission service rendering will be declared the winner. The registered discounts between the annual permitted revenue foreseen in the edict and the bids in the auction should reflect in the final calculation of the tariffs paid by the consumer.<\/p>\n<p>Below, the relation of qualified companies and consortiums by lot:<\/p>\n<p><st1:place w:st='on'><b>LOT<\/b><\/st1:place><b>A<\/b><\/p>\n<table class='MsoNormalTable'  cellspacing='1' cellpadding='0' border='1'>\n<tbody>\n<tr >\n<td  width='64.58%' bgcolor='transparent'>\n<p><b>Entrepreneurship<\/b><\/p>\n<\/td>\n<td  width='15.9%' bgcolor='transparent'>\n<p><b>Tension (kV)<\/b><\/p>\n<\/td>\n<td  width='18.88%' bgcolor='transparent'>\n<p><b>Approximate Extension (km)<\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&#160;<\/p>\n<p><font face='Verdana, Helvetica' size='2'>1) Isolux Ingenieria S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>2) Cons\u00f3rcio Amazonas (Centrais El\u00e9tricas do Norte do Brasil S\/A &#8211; Eletronorte &#8211; 30%; Companhia Hidroel\u00e9trica do S\u00e3o Francisco &#8211; Chesf &#8211; 19,5%; Abengoa Concess\u00f5es Brasil Holding S\/A &#8211; 30%; Fundo de Investimentos em Participa\u00e7\u00f5es Brasil Energia &#8211; 20,5%) (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>3) Cons\u00f3rcio Trans-Manaus (Alupar Investimento S\/A &#8211; 25%; Cymi Holding S\/A &#8211; 25%; Elecnor S\/A &#8211; 25%; CTEEP &#8211; Companhia de Transmiss\u00e3o de Energia El\u00e9trica Paulista &#8211; 25%) (Brasil)<\/font><\/p>\n<p>&#160;<\/p>\n<p><b>Forecast for entrance in commercial operation<\/b>: 36 months<\/p>\n<p><b>Allowed Annual Revenue<\/b>: R$ 98.52 million<\/p>\n<p><b>Estimate of direct jobs<\/b>: 6,900<\/p>\n<p><b>Localization<\/b>: The entrepreneurship will go through the municipalities of Tucuru\u00ed, Anapu, Pacaj\u00e1, Altamira and Vit\u00f3ria do <st1:place w:st='on'>Xingu<\/st1:place>, all in Par\u00e1.<\/p>\n<p><b>Benefits:<\/b> The entrepreneurship will allow for supplying electricity to several municipalities in the states of Par\u00e1, Amap\u00e1 and Amazonas, including the capitals: <st1:City w:st='on'><st1:place w:st='on'>Manaus<\/st1:place><\/st1:City> and Macap\u00e1. It will make the interconnection of several isolated regions to the National Interconnected System (SIN) possible. Thus, it will appease the consumer&#8217;s tariff reduction by cutting the expenses related to the Conta de Consumo de Combust\u00edveis F\u00f3sseis (Fossil Fuel Consumption Account &#8211; CCC). In 2008, the Account value was approved at R$ 3 billion.<\/p>\n<p><st1:place w:st='on'><b>LOT<\/b><\/st1:place><b>B<\/b><\/p>\n<table cellspacing='1' cellpadding='4' width='581' border='1'>\n<tbody>\n<tr>\n<td width='55%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Empreendimento<\/font><\/b><\/p>\n<\/td>\n<td width='18%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Tens\u00e3o (kV)<\/font><\/b><\/p>\n<\/td>\n<td width='27%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Extens\u00e3o aproximada km)<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Oriximin\u00e1 &#8211; Jurupari (PA)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>500<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>374<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Jurupari (PA) &#8211; Laranjal (AP)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>95<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Laranjal &#8211; Macap\u00e1 (AP)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>244<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Macap\u00e1 (AP)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>230\/69<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Laranjal (AP)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>230\/69<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Oriximin\u00e1 (PA)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>500-138<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'><font face='Verdana, Helvetica' size='2'>&#160;<\/font> <\/td>\n<td width='18%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Total<\/font><\/b><\/p>\n<\/td>\n<td width='27%'>\n<p><b><font face='Verdana, Helvetica' size='2'>713<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><b><br \/><\/b><font face='Verdana, Helvetica' size='2'>1) Isolux Ingenieria S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>2) Orteng Equipamentos e Sistemas Ltda. (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>3) Schahin Engenharia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>4) Cons\u00f3rcio Amazonas (Centrais El\u00e9tricas do Norte do Brasil S\/A &#8211; Eletronorte &#8211; 30%; Companhia Hidroel\u00e9trica do S\u00e3o Francisco &#8211; Chesf &#8211; 19,5%; Abengoa Concess\u00f5es Brasil Holding S\/A &#8211; 30%; Fundo de Investimentos em Participa\u00e7\u00f5es Brasil Energia &#8211; 20,5%) (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>5) Cons\u00f3rcio Solim\u00f5es (Alupar Investimento S\/A &#8211; 25%; Cobra Instalaciones y Servicios S\/A &#8211; 25%; Elecnor S\/A &#8211; 25%; CTEEP &#8211; Companhia de Transmiss\u00e3o de Energia El\u00e9trica Paulista &#8211; 25%) (Brasil)<\/font><\/p>\n<p>&#160;<\/p>\n<p><b>Forecast for entrance in commercial operation<\/b>: 36 months<\/p>\n<p><b>Allowed Annual Revenue<\/b>: R$ 86.49 million<\/p>\n<p><b>Estimate of direct jobs<\/b>: 6,100<\/p>\n<p><b>Localization:<\/b> The entrepreneurship will go through the Par\u00e1 municipalities of Almerim, <st1:place w:st='on'>Altamira<\/st1:place> and Monte Dourado and through the municipalities of Macap\u00e1, Laranjal do Jari, Mazag\u00e3o and Vit\u00f3ria do Jar\u00ed, all in Amap\u00e1.<\/p>\n<p><b>Benefits<\/b>: This entrepreneurship will allow for supplying electricity to several municipalities in the states of Amap\u00e1, including the state capital Macap\u00e1, and Par\u00e1, interconnecting several isolated regions to the National Interconnected System (SIN). It is also going to contribute to the consumer&#8217;s tariff reduction by cutting the expenses related to the Conta de Consumo de Combust\u00edveis F\u00f3sseis (Fossil Fuel Consumption Account &#8211; CCC). In 2008, the Account value was approved at R$ 3 billion.<\/p>\n<p><st1:place w:st='on'><b>LOT<\/b><\/st1:place><b>C<\/b><\/p>\n<table cellspacing='1' cellpadding='4' width='598' border='1'>\n<tbody>\n<tr>\n<td width='55%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Empreendimento<\/font><\/b><\/p>\n<\/td>\n<td width='18%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Tens\u00e3o (kV)<\/font><\/b><\/p>\n<\/td>\n<td width='27%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Extens\u00e3o aproximada (km)<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Oriximin\u00e1 (PA) &#8211; Itacoatiara (AM)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>500<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>374<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Itacoatiara &#8211; Cariri (AM)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>500<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>212<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Itacoatiara (AM)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>500\/138<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Cariri (AM)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>500\/230<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%' height='32'><\/td>\n<td width='18%' height='32'>\n<p><b><i><font face='Verdana, Helvetica' size='2'>Total<\/font><\/i><\/b><\/p>\n<\/td>\n<td width='27%' height='32'>\n<p><b><font face='Verdana, Helvetica' size='2'>586<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><b><br \/><\/b> <\/p>\n<p><font face='Verdana, Helvetica' size='2'>1) Isolux Ingenieria S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>2) Cons\u00f3rcio Amazonas (Centrais El\u00e9tricas do Norte do Brasil S\/A &#8211; Eletronorte &#8211; 30%; Companhia Hidroel\u00e9trica do S\u00e3o Francisco &#8211; Chesf &#8211; 19,5%; Abengoa Concess\u00f5es Brasil Holding S\/A &#8211; 30%; Fundo de Investimentos em Participa\u00e7\u00f5es Brasil Energia &#8211; 20,5%) (Brasil)<\/font><\/p>\n<p align='justify'><font face='Verdana, Helvetica' size='2'>3) Cons\u00f3rcio Solim\u00f5es (Alupar Investimento S\/A &#8211; 25%; Cobra Instalaciones y Servicios S\/A &#8211; 25%; Elecnor S\/A &#8211; 25%; CTEEP &#8211; de Transmiss\u00e3o de Energia El\u00e9trica Paulista &#8211; 25%) (Brasil)<\/font><\/p>\n<p  >&#160;<\/p>\n<p><b>Forecast for entrance in commercial operation<\/b>: 36 months<\/p>\n<p><b>Allowed Annual Revenue<\/b>: R$ 109.25 million<\/p>\n<p><b>Estimate of direct jobs:<\/b> 7.700<\/p>\n<p><b>Localization:<\/b> The lines will go through the municipalities of Manaus, Itacoatiara, Nhamund\u00e1, Urucar\u00e1, Rio Preto da Eva, Silves, S\u00e3o Sebasti\u00e3o do Uatum\u00e3, in Amazonas and Terra Santa, \u00d3bidos, Alenquer, Oriximin\u00e1, Curu\u00e1, Faro, Prainha and Altamira, all in Par\u00e1.<\/p>\n<p><b>Benefits:<\/b> This entrepreneurship will allow for supplying electricity to several municipalities in the states of Amazonas, including the state capital <st1:City w:st='on'><st1:place w:st='on'>Manaus<\/st1:place><\/st1:City>, and Par\u00e1, interconnecting several isolated regions to the National Interconnected System (SIN). It is also going to contribute to the consumer&#8217;s tariff reduction by cutting the expenses related to the Conta de Consumo de Combust\u00edveis F\u00f3sseis (Fossil Fuel Consumption Account &#8211; CCC). In 2008, the Account value was approved at R$ 3 billion.<\/p>\n<p><st1:place w:st='on'><b>LOT<\/b><\/st1:place><b>D<\/b><\/p>\n<table cellspacing='1' cellpadding='4' width='595' border='1'>\n<tbody>\n<tr>\n<td width='54%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Empreendimento<\/font><\/b><\/p>\n<\/td>\n<td width='20%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Tens\u00e3o (kV)<\/font><\/b><\/p>\n<\/td>\n<td width='26%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Extens\u00e3o aproximada km)<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='54%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Maggi &#8211; Juba (MT)<\/font><\/p>\n<\/td>\n<td width='20%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='26%'>\n<p><font face='Verdana, Helvetica' size='2'>232<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='54%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Parecis &#8211; Maggi (MT)<\/font><\/p>\n<\/td>\n<td width='20%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='26%'>\n<p><font face='Verdana, Helvetica' size='2'>106<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='54%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Ju\u00edna &#8211; Maggi (MT)<\/font><\/p>\n<\/td>\n<td width='20%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='26%'>\n<p><font face='Verdana, Helvetica' size='2'>215<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='54%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Nova Mutum &#8211; Sorriso (MT)<\/font><\/p>\n<\/td>\n<td width='20%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='26%'>\n<p><font face='Verdana, Helvetica' size='2'>145<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='54%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Sorriso &#8211; Sinop (MT)<\/font><\/p>\n<\/td>\n<td width='20%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='26%'>\n<p><font face='Verdana, Helvetica' size='2'>77<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='54%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Parecis<\/font><\/p>\n<\/td>\n<td width='20%'>\n<p><font face='Verdana, Helvetica' size='2'>230\/138\/13,8<\/font><\/p>\n<\/td>\n<td width='26%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='54%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Ju\u00edna<\/font><\/p>\n<\/td>\n<td width='20%'>\n<p><font face='Verdana, Helvetica' size='2'>230\/138\/13,8<\/font><\/p>\n<\/td>\n<td width='26%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='54%'><font face='Verdana, Helvetica' size='2'>&#160;<\/font> <\/td>\n<td width='20%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Total<\/font><\/b><\/p>\n<\/td>\n<td width='26%'>\n<p><b><font face='Verdana, Helvetica' size='2'>775<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/p>\n<p><font face='Verdana, Helvetica' size='2'>1) Orteng Equipamentos e Sistemas Ltda. (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>2) Schahin Engenharia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>3) Abengoa Concess\u00f5es Brasil Holding S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>4) Isolux Ingenieria S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>5) Elecnor Transmiss\u00e3o de Energia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>6) Cymi Holding S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>7) CTEEP &#8211; de Transmiss\u00e3o de Energia El\u00e9trica Paulista (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>8) Cobra Instalaciones y Servicios S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>9) Alupar Investimento S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>10) Cons\u00f3rcio Neoenergia &#8211; Odebrecht (Neoenergia S\/A &#8211; 51%; Odebrecht Investimentos em Infra-Estrutura Ltda. 45%; Construtora Norberto Odebrecht S\/A &#8211; 4%) (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>11) Cons\u00f3rcio Linha Verde (Centrais El\u00e9tricas do Norte do Brasil S\/A &#8211; Eletronorte &#8211; 45%; Bimetal Ind\u00fastria Metal\u00fargica Ltda. &#8211; 20%; Terna Participa\u00e7\u00f5es S\/A &#8211; 35%) (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>12) Cons\u00f3rcio TBE Centro-Oeste (Empresa Amazonense de Transmiss\u00e3o de Energia S\/A &#8211; 51%; Cemig Gera\u00e7\u00e3o e Transmiss\u00e3o S\/A &#8211; 49%) (Brasil)<\/font><\/p>\n<p  >&#160;<\/p>\n<p><b>Forecast for entrance in commercial operation<\/b>: 20 months<\/p>\n<p><b>Allowed Annual Revenue<\/b>: R$ 36.79 million<\/p>\n<p><b>Estimate of direct jobs:<\/b> 2,700<\/p>\n<p><b>Localization:<\/b> The entrepreneurship will go through the municipalities of Ju\u00edna, Brasnorte, Sapezal, Nova Mutum, Sorriso, Sinop, Tangar\u00e1 da Serra, Campo Novo dos Parecis, Lucas do Rio Verde and <st1:PersonName w:st='on'>Vera<\/st1:PersonName>, all in Mato Grosso.<\/p>\n<p><b>Benefits:<\/b> This entrepreneurship will allow for distribution of electricity from several generation projects which will be implemented in the region of the state of Mato Grosso, being that 1,120 MW are already predicted for 2010, contributing to the state&#8217;s development and to increasing the national electricity generation capacity.<\/p>\n<p><st1:place w:st='on'><b>LOT<\/b><\/st1:place><b>E<\/b><\/p>\n<table cellspacing='1' cellpadding='4' width='581' border='1'>\n<tbody>\n<tr>\n<td width='55%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Empreendimento<\/font><\/b><\/p>\n<\/td>\n<td width='18%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Tens\u00e3o (kV)<\/font><\/b><\/p>\n<\/td>\n<td width='27%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Extens\u00e3o<\/font><\/b><\/p>\n<p><b><font face='Verdana, Helvetica' size='2'>aproximada (km)<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Interlagos &#8211; Piratininga II (SP)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>345<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>1,5<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Piratininga II<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>345\/138\/88<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><b><br \/><\/b> <\/p>\n<p><font face='Verdana, Helvetica' size='2'>1) Orteng Equipamentos e Sistemas Ltda. (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>2) Abengoa Concess\u00f5es Brasil Holding S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>3) Isolux Ingenieria S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>4) Empresa Catarinense de Transmiss\u00e3o de Energia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>5) Elecnor Transmiss\u00e3o de Energia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>6) Cymi Holding S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>7) CTEEP &#8211; Companhia de Transmiss\u00e3o de Energia El\u00e9trica Paulista (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>8) Cobra Instalaciones y Servicios S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>9) Alupar Investimento S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>10) Cons\u00f3rcio S\u00e3o Sim\u00e3o (Furnas Centrais El\u00e9tricas S\/A &#8211; 49%; Delta Constru\u00e7\u00f5es S\/A &#8211; 17%; Fuad Rassi Eng. Ind. e Com. Ltda &#8211; 17%; MPE Montagens e Projetos Especiais S\/A &#8211; 17%) (Brasil)<\/font><\/p>\n<p>&#160;<\/p>\n<p><b>Forecast for entrance in commercial operation<\/b>: 18 months<\/p>\n<p><b>Allowed Annual Revenue<\/b>: R$ 9 million<\/p>\n<p><b>Estimate of direct jobs<\/b>: 700<\/p>\n<p><b>Localization:<\/b><\/p>\n<p><st1:City w:st='on'>S\u00e3o Paulo<\/st1:City> state municipalities of Piratininga and <st1:City w:st='on'><st1:place w:st='on'>S\u00e3o Paulo<\/st1:place><\/st1:City>.<\/p>\n<p><b>Benefits<\/b>: It will reinforce the supply of electricity of the largest metropolitan region of <st1:country-region w:st='on'>Brazil<\/st1:country-region> which is <st1:City w:st='on'><st1:place w:st='on'>S\u00e3o Paulo<\/st1:place><\/st1:City>, more specifically in the southwest region, which has been presenting growth in industrial consumption, providing the continuous economic development of the region.<\/p>\n<p><st1:place w:st='on'><b>LOT<\/b><\/st1:place><b>F<\/b><\/p>\n<table cellspacing='1' cellpadding='4' width='581' border='1'>\n<tbody>\n<tr>\n<td width='55%'>\n<p><b><i><font face='Verdana, Helvetica' size='2'>Empreendimento<\/font><\/i><\/b><\/p>\n<\/td>\n<td width='18%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Tens\u00e3o (kV)<\/font><\/b><\/p>\n<\/td>\n<td width='27%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Extens\u00e3o aproximada (km)<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Nova Santa Rita &#8211; Scharlau (RS)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>23<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Scharlau (RS)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>230\/138<\/font><\/p>\n<\/td>\n<td width='27%'><font face='Verdana, Helvetica' size='2'>&#160;<\/font> <\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/p>\n<p><font face='Verdana, Helvetica' size='2'>1) Orteng Equipamentos e Sistemas Ltda. (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>2) Schahin Engenharia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>3) Eletrosul Centrais El\u00e9tricas S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>4) Copel Gera\u00e7\u00e3o e Transmiss\u00e3o S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>5) Abengoa Concess\u00f5es Brasil Holding S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>6) Isolux Ingenieria S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>7) Empresa Catarinense de Transmiss\u00e3o de Energia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>8) Elecnor Transmiss\u00e3o de Energia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>9) Cymi Holding S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>10) CTEEP &#8211; Companhia de Transmiss\u00e3o de Energia El\u00e9trica Paulista (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>11) Cobra Instalaciones y Servicios S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>12) Alupar Investimento S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>13) TPI Triunfo Participa\u00e7\u00f5es e Investimentos S\/A (Brasil)<\/font><\/p>\n<p  >&#160;<\/p>\n<p><b><i>*<\/i><\/b><b>There is not the participation of consortiums.<\/b><\/p>\n<p><b>Forecast for entrance in commercial operation<\/b>: 18 months<\/p>\n<p><b>Allowed Annual Revenue:<\/b> R$ 3.68 million<\/p>\n<p><b>Estimate of direct jobs:<\/b> 300<\/p>\n<p><b>Localization:<\/b> Municipalities of Nova Santa Rita, Port\u00e3o, S\u00e3o Leopoldo, Novo Hamburgo, Montenegro, Capela de Santana and Sapucaia do Sul, in Rio Grande do Sul.<\/p>\n<p><b>Benefits:<\/b> This entrepreneurships will reinforce the supply of electricity in this region, which has been presenting an increase in the demand due to the concentration of industrial parks, allowing for the continuity of the region&#8217;s social-economic development.<\/p>\n<p>&#160;<\/p>\n<p><st1:place w:st='on'><b>LOT<\/b><\/st1:place><b>G<\/b><\/p>\n<table cellspacing='1' cellpadding='4' width='581' border='1'>\n<tbody>\n<tr>\n<td width='55%'>\n<p><b><i><font face='Verdana, Helvetica' size='2'>Empreendimento<\/font><\/i><\/b><\/p>\n<\/td>\n<td width='18%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Tens\u00e3o (kV)<\/font><\/b><\/p>\n<\/td>\n<td width='27%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Extens\u00e3o aproximada (km)<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Eun\u00e1polis &#8211; Teixeira de Freitas II (BA)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>152<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Teixeira de Freitas II (BA)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>230\/138<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/p>\n<p><font face='Verdana, Helvetica' size='2'>1) Orteng Equipamentos e Sistemas Ltda. (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>2) Schahin Engenharia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>3) Companhia Hidro El\u00e9trica do S\u00e3o Francisco &#8211; Chesf (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>4) Neoenergia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>5) Terna Participa\u00e7\u00f5es S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>6) Abengoa Concess\u00f5es Brasil Holding S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>7) Isolux Ingenieria S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>8) Elecnor Transmiss\u00e3o de Energia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>9) Cymi Holding S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>10) CTEEP &#8211; Companhia de Transmiss\u00e3o de Energia El\u00e9trica Paulista (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>11) Cobra Instalaciones y Servicios S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>12) Alupar Investimento S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>13) Cons\u00f3rcio TBE Brasil (Empresa Catarinense de Transmiss\u00e3o de Energia S\/A &#8211; 51%; Cemig Gera\u00e7\u00e3o e Transmiss\u00e3o S\/A &#8211; 49%) (Brasil)<\/font><\/p>\n<p  >&#160;<\/p>\n<p><b>Forecast for entrance in commercial operation<\/b>: 18 months<\/p>\n<p><b>Allowed Annual Revenue:<\/b> R$ 4.83 million<\/p>\n<p><b>Estimate of direct jobs:<\/b> 350<\/p>\n<p><b>Localization:<\/b> The entrepreneurship will go through the municipalities of Eunapolis, Porto Seguro, Itabela, Itamaraju, Vereda and Teixeira de Freitas, all in <st1:place w:st='on'>Bahia<\/st1:place>.<\/p>\n<p><b>Benefits:<\/b> The implementation of this entrepreneurship will have essential importance for the tourist and agro-industrial development of the southern region of the state of <st1:place w:st='on'>Bahia<\/st1:place>.<\/p>\n<p>&#160;<\/p>\n<p><st1:place w:st='on'><b>Lot<\/b><\/st1:place><b>H<\/b><\/p>\n<table cellspacing='1' cellpadding='4' width='581' border='1'>\n<tbody>\n<tr>\n<td width='55%'>\n<p><b><i><font face='Verdana, Helvetica' size='2'>Empreendimento<\/font><\/i><\/b><\/p>\n<\/td>\n<td width='18%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Tens\u00e3o (kV)<\/font><\/b><\/p>\n<\/td>\n<td width='27%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Extens\u00e3o aproximada (km)<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Mirassol II (SP)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>440\/138<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Getulina (SP)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>440\/138<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Araras (SP)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>440\/138<\/font><\/p>\n<\/td>\n<td width='27%'><font face='Verdana, Helvetica' size='2'>&#160;<\/font> <\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><b><br \/><\/b> <\/p>\n<p><font face='Verdana, Helvetica' size='2'>1) Orteng Equipamentos e Sistemas Ltda. (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>2) Abengoa Concess\u00f5es Brasil Holding S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>3) Isolux Ingenieria S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>4) Elecnor Transmiss\u00e3o de Energia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>5) Cymi Holding S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>6) CTEEP &#8211; Companhia de Transmiss\u00e3o de Energia El\u00e9trica Paulista (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>7) Cobra Instalaciones y Servicios S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>8) Alupar Investimento S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>9) Cons\u00f3rcio TBE Brasil (Empresa Catarinense de Transmiss\u00e3o de Energia S\/A &#8211; 51%; Cemig Gera\u00e7\u00e3o e Transmiss\u00e3o S\/A &#8211; 49%) (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>10) Cons\u00f3rcio S\u00e3o Sim\u00e3o (Furnas Centrais El\u00e9tricas S\/A &#8211; 49%; Delta Constru\u00e7\u00f5es S\/A &#8211; 17%; Fuad Rassi Eng. Ind. e Com. Ltda &#8211; 17%; MPE Montagens e Projetos Especiais S\/A &#8211; 17%)<\/font><\/p>\n<p>&#160;<\/p>\n<p  >&#160;<\/p>\n<p><b>Forecast for entrance in commercial operation<\/b>: 18 months<\/p>\n<p><b>Allowed Annual Revenue:<\/b> R$ 21.18 million<\/p>\n<p><b>Estimate of direct jobs:<\/b> 1,700<\/p>\n<p><b>Localization:<\/b> The entrepreneurship will go through the municipalities of Mirassol, Guaimb\u00e9 and Araras, in <st1:City w:st='on'><st1:place w:st='on'>S\u00e3o Paulo<\/st1:place><\/st1:City>.<\/p>\n<p><b>Benefits:<\/b> This entrepreneurship will provide the reinforcement of the electricity supply to important regions in the state of <st1:City w:st='on'>S\u00e3o Paulo<\/st1:City>, such as: <st1:City w:st='on'>Ribeir\u00e3o Preto<\/st1:City>, Araraquara, <st1:City w:st='on'>S\u00e3o Carlos<\/st1:City>, <st1:City w:st='on'>Limeira<\/st1:City>, <st1:City w:st='on'>Rio Claro<\/st1:City>, Mogi Mirim, Mar\u00edlia, <st1:City w:st='on'><st1:place w:st='on'>Bauru<\/st1:place><\/st1:City>, Lins, Catanduva and S\u00e3o Jos\u00e9 do Rio Preto, contributing to the economic development of these regions.<\/p>\n<p><st1:place w:st='on'><b>Lot<\/b><\/st1:place><b>I<\/b><\/p>\n<table cellspacing='1' cellpadding='4' width='581' border='1'>\n<tbody>\n<tr>\n<td width='55%'>\n<p><b><i><font face='Verdana, Helvetica' size='2'>Empreendimento<\/font><\/i><\/b><\/p>\n<\/td>\n<td width='18%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Tens\u00e3o (kV)<\/font><\/b><\/p>\n<\/td>\n<td width='27%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Extens\u00e3o aproximada (km)<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Joinvile Norte (SC) &#8211; Curitiba C2 (PR)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>100<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Jorge Lacerda B &#8211; Sider\u00f3polis C3 (SC)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>50<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Forquilhinha (SC)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>230\/69<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'><font face='Verdana, Helvetica' size='2'>&#160;<\/font> <\/td>\n<td width='18%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Total<\/font><\/b><\/p>\n<\/td>\n<td width='27%'>\n<p><b><font face='Verdana, Helvetica' size='2'>150<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/p>\n<p><font face='Verdana, Helvetica' size='2'>1) Orteng Equipamentos e Sistemas Ltda. (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>2) Schahin Engenharia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>3) Eletrosul Centrais El\u00e9tricas S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>4) Copel Gera\u00e7\u00e3o e Transmiss\u00e3o S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>5) Terna Participa\u00e7\u00f5es S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>6) Abengoa Concess\u00f5es Brasil Holding S\/A (Brasil<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>7) Isolux Ingenieria S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>8) Elecnor Transmiss\u00e3o de Energia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>9) Cymi Holding S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>10) CTEEP &#8211; Companhia de Transmiss\u00e3o de Energia El\u00e9trica Paulista (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>11) Cobra Instalaciones y Servicios S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>12) TPI Triunfo Participa\u00e7\u00f5es e Investimentos S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>13) Alupar Investimento S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>14) Cons\u00f3rcio TBE Brasil (Empresa Catarinense de Transmiss\u00e3o de Energia S\/A &#8211; 51%; Cemig Gera\u00e7\u00e3o e Transmiss\u00e3o S\/A &#8211; 49%) (Brasil)<\/font><\/p>\n<p  >&#160;<\/p>\n<p><b>Forecast for entrance in commercial operation<\/b>: 18 months<\/p>\n<p><b>Allowed Annual Revenue:<\/b> R$ 9.25 million<\/p>\n<p><b>Estimate of direct jobs:<\/b> 700<\/p>\n<p><b>Localization:<\/b> The entrepreneurship will go through the municipalities of Curitiba, Arauc\u00e1ria, Fazenda Rio Grande, Guaratuba, S\u00e3o Jos\u00e9 dos Pinhais and Tijucas do Sul, all in Paran\u00e1; and Joinville, Capivari de Baixo, Cocal do Sul, Crici\u00fama, Forquilhinha, Nova Veneza, Gravatal, Morro da Fuma\u00e7a, Pedras Grandes, Sider\u00f3polis, Treze de Maio, Tubar\u00e3o and Urussanga, in Santa Catarina.<\/p>\n<p><b>Benefits:<\/b> This entrepreneurship will provide the reinforcement of energy supply in these regions, which present large growth of electricity demand, especially due to the concentration of industrial parks,<\/p>\n<p>providing the advance of economic development in the southern region of the state of Santa Catarina.<\/p>\n<p><b>Lot J<\/b><\/p>\n<table cellspacing='1' cellpadding='4' width='581' border='1'>\n<tbody>\n<tr>\n<td width='55%'>\n<p><b><i><font face='Verdana, Helvetica' size='2'>Empreendimento<\/font><\/i><\/b><\/p>\n<\/td>\n<td width='18%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Tens\u00e3o (kV)<\/font><\/b><\/p>\n<\/td>\n<td width='27%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Extens\u00e3o aproximada km)<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Venda das Pedras (RJ)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>345\/138<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/p>\n<p><font face='Verdana, Helvetica' size='2'>1) Orteng Equipamentos e Sistemas Ltda. (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>2) Abengoa Concess\u00f5es Brasil Holding S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>3) Isolux Ingenieria S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>4) Empresa Catarinense de Transmiss\u00e3o de Energia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>5) Elecnor Transmiss\u00e3o de Energia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>6) Cymi Holding S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>7) CTEEP &#8211; Companhia de Transmiss\u00e3o de Energia El\u00e9trica Paulista (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>8) Cobra Instalaciones y Servicios S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>9) Alupar Investimento S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>10) Cons\u00f3rcio S\u00e3o Sim\u00e3o (Furnas Centrais El\u00e9tricas S\/A &#8211; 49%; Delta Constru\u00e7\u00f5es S\/A &#8211; 17%; Fuad Rassi Eng. Ind. e Com. Ltda &#8211; 17%; MPE Montagens e Projetos Especiais S\/A &#8211; 17%) (Brasil)<\/font><\/p>\n<p  >&#160;<\/p>\n<p><b>Forecast for entrance in commercial operation<\/b>: 18 months<\/p>\n<p><b>Allowed Annual Revenue:<\/b> R$ 6.95 million<\/p>\n<p><b>Estimate of direct jobs:<\/b> 550<\/p>\n<p><b>Localization:<\/b> The entrepreneurship will go through the municipalities of Itabora\u00ed and Cachoeiras de Macacu, in <st1:City w:st='on'><st1:place w:st='on'>Rio de Janeiro<\/st1:place><\/st1:City>.<\/p>\n<p><b>Benefits:<\/b> This entrepreneurship will reinforce the service to this region, which presents great concentration of industrial parks, and which presents itself basically as an energy importer.<\/p>\n<p><b>Lot K<\/b><\/p>\n<table cellspacing='1' cellpadding='4' width='581' border='1'>\n<tbody>\n<tr>\n<td width='55%'>\n<p><b><i><font face='Verdana, Helvetica' size='2'>Empreendimento<\/font><\/i><\/b><\/p>\n<\/td>\n<td width='18%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Tens\u00e3o (kV)<\/font><\/b><\/p>\n<\/td>\n<td width='27%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Extens\u00e3o aproximada (km)<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Atibaia II (SP)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>345\/138<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/p>\n<p><font face='Verdana, Helvetica' size='2'>1) Orteng Equipamentos e Sistemas Ltda. (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>2) Abengoa Concess\u00f5es Brasil Holding S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>3) Isolux Ingenieria S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>4) Empresa Catarinense de Transmiss\u00e3o de Energia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>5) Elecnor Transmiss\u00e3o de Energia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>6) Cymi Holding S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>7) CTEEP &#8211; Companhia de Transmiss\u00e3o de Energia El\u00e9trica Paulista (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>8) Cobra Instalaciones y Servicios S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>9) Alupar Investimento S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>10) Cons\u00f3rcio S\u00e3o Sim\u00e3o (Furnas Centrais El\u00e9tricas S\/A &#8211; 49%; Delta 17% Constru\u00e7\u00f5es S\/A &#8211; 17%; Fuad Rassi Eng. Ind. e Com. Ltda &#8211; 17%; MPE Montagens e Projetos Especiais S\/A &#8211; 17%) (Brasil)<\/font><\/p>\n<p  >&#160;<\/p>\n<p><b>Forecast for entrance in commercial operation<\/b>: 18 months<\/p>\n<p><b>Allowed Annual Revenue:<\/b> R$ 3.63 million<\/p>\n<p><b>Estimate of direct jobs:<\/b> 300<\/p>\n<p><b>Localization:<\/b> The entrepreneurship will go through the <st1:City w:st='on'><st1:place w:st='on'>S\u00e3o Paulo<\/st1:place><\/st1:City> municipalities of Atibaia and Bragan\u00e7a Paulista.<\/p>\n<p><b>Benefits:<\/b> This entrepreneurship will provide the reinforcement of the electricity supply to important regions in the interior of the state of <st1:City w:st='on'><st1:place w:st='on'>S\u00e3o Paulo<\/st1:place><\/st1:City>, contributing to economic development of these regions.<\/p>\n<p><b>Lot L<\/b><\/p>\n<table cellspacing='1' cellpadding='4' width='581' border='1'>\n<tbody>\n<tr>\n<td width='55%'>\n<p><b><i><font face='Verdana, Helvetica' size='2'>Empreendimento<\/font><\/i><\/b><\/p>\n<\/td>\n<td width='18%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Tens\u00e3o (kV)<\/font><\/b><\/p>\n<\/td>\n<td width='27%'>\n<p><b><font face='Verdana, Helvetica' size='2'>Extens\u00e3o aproximada km)<\/font><\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>LT S\u00e3o Sim\u00e3o (MG)* &#8211; Itagua\u00e7u (GO)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>500<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>23<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>LT Itagua\u00e7u &#8211; Barra dos Coqueiros (GO)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>49<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Itagua\u00e7u (GO)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>500\/230<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width='55%'>\n<p><font face='Verdana, Helvetica' size='2'>SE Barra dos Coqueiros (GO)<\/font><\/p>\n<\/td>\n<td width='18%'>\n<p><font face='Verdana, Helvetica' size='2'>230<\/font><\/p>\n<\/td>\n<td width='27%'>\n<p><font face='Verdana, Helvetica' size='2'>&#8211;<\/font><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><b><br \/><\/b> <\/p>\n<p><b><font face='Verdana, Helvetica' size='2'>* <i>A subesta\u00e7\u00e3o S\u00e3o Sim\u00e3o estar\u00e1 localizada no munic\u00edpio mineiro de Santa Vit\u00f3ria<\/i><\/font><\/b><\/p>\n<p><font face='Verdana, Helvetica' size='2'>1) Orteng Equipamentos e Sistemas Ltda. (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>2) Schahin Engenharia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>3) Terna Participa\u00e7\u00f5es S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>4) Abengoa Concess\u00f5es Brasil Holding S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>5) Isolux Ingenieria S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>6) Empresa Catarinense de Transmiss\u00e3o de Energia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>7) Elecnor Transmiss\u00e3o de Energia S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>8) Cymi Holding S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>9) CTEEP &#8211; Companhia de Transmiss\u00e3o de Energia El\u00e9trica Paulista (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>10) Cobra Instalaciones y Servicios S\/A (Espanha)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>11) TPI Triunfo Participa\u00e7\u00f5es e Investimentos S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>12) Alupar Investimento S\/A (Brasil)<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>13) Cons\u00f3rcio S\u00e3o Sim\u00e3o (Furnas Centrais El\u00e9tricas S\/A &#8211; 49%; Delta Constru\u00e7\u00f5es S\/A &#8211; 17%; Fuad Rassi Eng. Ind. e Com. Ltda &#8211; 17%; MPE Montagens e Projetos Especiais S\/A &#8211; 17%) (Brasil)<\/font><\/p>\n<p  >&#160;<\/p>\n<p><b>* <i>The S\u00e3o Sim\u00e3o substation will be located in the Minas Gerais <st1:place w:st='on'><st1:PlaceType w:st='on'>municipality<\/st1:PlaceType> of <st1:PlaceName w:st='on'>Santa Vit\u00f3ria<\/st1:PlaceName><\/st1:place><\/i><\/b><\/p>\n<p><b>Forecast for entrance in commercial operation<\/b>: 15 months<\/p>\n<p><b>Allowed Annual Revenue:<\/b> R$ 8.25 million<\/p>\n<p><b>Estimate of direct jobs:<\/b> 600<\/p>\n<p><b>Localization:<\/b> The entrepreneurship will go through the municipalities of Cachoeira Alta. Paranaiguara and S\u00e3o Sim\u00e3o, in Goi\u00e1s; and the Minas Gerais <st1:place w:st='on'><st1:PlaceType w:st='on'>municipality<\/st1:PlaceType> of <st1:PlaceName w:st='on'>Santa Vit\u00f3ria<\/st1:PlaceName><\/st1:place>.<\/p>\n<p  ><b>Benefits:<\/b> The implementation of the entrepreneurship aims at the outlet of a hydraulic potential of approximately 1,000 MW, and yet approximately 350 MW from thermal mills using sugarcane bagasse, predicted to be installed in southern Goi\u00e1s, contributing to the region&#8217;s economical development and to the increase of the national electricity generation capacity.<\/p>\n<p>&#160;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL Companies from Brazil and Spain confirmed participation in the auction of concession of 19 transmission lines and 20 substations that the Brazilian Electricity Regulatory Agency (Aneel) will hold tomorrow (06\/27) at 10 a.m., in Rio de Janeiro, in a public session lead by the S\u00e3o Paulo Stock Market (Bovespa). The 12 lots offered [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/14081"}],"collection":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=14081"}],"version-history":[{"count":0,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/14081\/revisions"}],"wp:attachment":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=14081"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=14081"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=14081"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}