{"id":14069,"date":"2008-07-08T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-2646","status":"publish","type":"post","link":"https:\/\/sindenergia.com.br\/seminario\/?p=14069","title":{"rendered":"Proposal for Madeira Complex transmission line auction notice under consultation"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=2646&#038;id_area=90'><b>ANEEL<\/b><\/a><\/p>\n<p  >Electric Energy National Agency (Aneel) approved today (07\/08), in a referee board of directors&#8217; meeting, the instatement of a documental Public Hearing to obtain contributions to 007\/2008 auction notice proposal for enterprises that shall connect power plants from Madeira River Hydroelectric Complex power plants, in Rond\u00f4nia to the National Interlinked System (SIN).<\/p>\n<p>Bid aims at granting seven lots with the whole power lines and substations scheduled in the Federal Government planning, according to resolution # <a href='http:\/\/www.aneel.gov.br\/arquivos\/PDF\/Resolu\u00e7\u00e3o%20CNPE%202007%20(Sto%20Antonio).pdf'><b><u>4\/2007<\/u><\/b><\/a> from the Energy Policy National Council (CNPE) and resolutions from the Privatization National Council (CND) # <a href='http:\/\/www.aneel.gov.br\/cedoc\/res2008010cnd.pdf'><b><u>10\/2008<\/u><\/b><\/a>, which propose including the said enterprises into the Privatization National Program (PND).<\/p>\n<p>Documents relating to the notice minutes are available at &#8216;A Aneel&#8217; profile from link <a href='http:\/\/www.aneel.gov.br\/area.cfm?idArea=13&amp;idPerfil=3'><b><u>Audi\u00eancias\/Consultas\/F\u00f3rum\/Audi\u00eancias ano 2008<\/u><\/b><\/a>[Hearings\/Consultations\/Forum\/Year 2008 hearings] at the electronic address &#160; <a href='http:\/\/www.aneel.gov.br\/'><b><u>www.aneel.gov.br<\/u><\/b><\/a>.&#160; Contributions may be sent from tomorrow (07\/09) until July 19 to the email <a href='mailto:map047_2008@aneel.gov.br'><b><u>ap047_2008@aneel.gov.br<\/u><\/b><\/a>. Suggestions shall also be received by the fax # (61) 2192.8839 or by mail to the address SGAN, Quadra 603, M\u00f3dulo I, T\u00e9rreo, Protocolo Geral da Aneel, CEP [ZIP] 70.830-030, Bras\u00edlia-DF.<\/p>\n<p><b>Rules<\/b> &#8211; In compliance to directive from the Ministry of Mines and Energy, the auction shall have two technological options: one characterized by direct current facilities (CC Option) and the other by direct and alternate current facilities, called hybrid option (HB Option). A bid with the chance of choosing between two technologies shall contribute to foster competition and consequent taxation mode.<\/p>\n<p>According to the hearing minutes, the auction shall have two phases. The first one shall select the technological option between CC and HB. The winning option shall be the one whose sum of the lowest bids for their respective lots (A to E) is the lowest. The second one shall be the auction of the seven lots proper, with the technological option that won the first phase in compliance with criteria already adopted by the Agency for power line auctions: the winner shall be the one that offers the lower tariff. That is, the smaller Allowed Annual Revenue (RAP) for power line service provision.<\/p>\n<p>Check distribution of lots by technology in the table below:<\/p>\n<div align='center'>\n<table class='MsoNormalTable'  cellspacing='1' cellpadding='0' border='1'>\n<tbody>\n<tr >\n<td  bgcolor='transparent' colspan='6'>\n<p  align='center'><b>TECHNOLOGICAL OPTION<\/b><\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='50%' bgcolor='transparent' colspan='3'>\n<p  align='center'><b>Direct current<\/b><\/p>\n<\/td>\n<td  width='50%' bgcolor='transparent' colspan='3'>\n<p  align='center'><b>Hybrid<\/b><\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='5%' bgcolor='transparent' rowspan='7'>\n<p  align='center'><b>LOTS<\/b><\/p>\n<\/td>\n<td  width='7%' bgcolor='transparent'>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>A<\/p>\n<\/td>\n<td  width='38%' bgcolor='transparent'>\n<p>\u00b7 500\/230 KV Porto Velho Receiving Substation<\/p>\n<p>\u00b7 2 AC\/DC\/AC conversion stations<\/p>\n<p>\u00b7 230 kV Porto Velho (RO) &#8211; Porto Velho (RO) Receiving LT and a <st1:metricconverter w:st='on' ProductID='12 km'>12 km<\/st1:metricconverter> extension<\/p>\n<\/td>\n<td  width='5%' bgcolor='transparent' rowspan='7'>\n<p  align='center'><b>LOTS<\/b><\/p>\n<\/td>\n<td  width='7%' bgcolor='transparent'>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>A<\/p>\n<\/td>\n<td  width='38%' bgcolor='transparent'>\n<p>&#160;<\/p>\n<p>\u00b7 500\/230 kV Porto Velho Receiving Substation<\/p>\n<p>\u00b7 230 kV Porto Velho (RO) &#8211; Porto Velho (RO) Receiving LT and a <st1:metricconverter w:st='on' ProductID='12 km'>12 km<\/st1:metricconverter> extension<\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='7%' bgcolor='transparent'>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>B<\/p>\n<\/td>\n<td  width='38%' bgcolor='transparent'>\n<p>&#160;<\/p>\n<p>&#160;<\/p>\n<p>&#160;<\/p>\n<p>\u00b7 500 kV Cuiab\u00e1 (MT) &#8211; Ribeir\u00e3ozinho (MT) LT&#160; and a <st1:metricconverter w:st='on' ProductID='364 km'>364 km<\/st1:metricconverter> extension<\/p>\n<p>&#160;<\/p>\n<p>\u00b7 500 kV Ribeir\u00e3ozinho (MT) &#8211;&#160; Rio Verde (GO) LT and a <st1:metricconverter w:st='on' ProductID='242 km'>242 km<\/st1:metricconverter> extension<\/p>\n<\/td>\n<td  width='7%' bgcolor='transparent'>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>B<\/p>\n<\/td>\n<td  width='38%' bgcolor='transparent'>\n<p>\u00b7 500 kV Porto Velho (RO) &#8211; Ji Paran\u00e1 (RO) Receiving LT and a <st1:metricconverter w:st='on' ProductID='320 km'>320 km<\/st1:metricconverter> extension;<\/p>\n<p>\u00b7 500 kV Ji Paran\u00e1 Substation (RO)<\/p>\n<p>\u00b7 500 kV Paran\u00e1 (RO) &#8211; Colorado do Oeste (RO) LT and a <st1:metricconverter w:st='on' ProductID='300 km'>300 km<\/st1:metricconverter> extension;<\/p>\n<p>\u00b7 500 kV Colorado do Oeste substation<\/p>\n<p>\u00b7 500 kV Colorado do Oeste (RO) &#8211; Jauru (MT) LT and a <st1:metricconverter w:st='on' ProductID='320 km'>320 km<\/st1:metricconverter> extension<\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='7%' bgcolor='transparent'>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>C<\/p>\n<\/td>\n<td  width='38%' bgcolor='transparent'>\n<p>&#160;<\/p>\n<p>\u00b7 01 AC\/DC, 500\/\u00b1600 kV Converter Station<\/p>\n<p>\u00b7 01 AC\/DC, 600\/\u00b1500 kV Inverter Station<\/p>\n<p>&#160;<\/p>\n<\/td>\n<td  width='7%' bgcolor='transparent'>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>C<\/p>\n<\/td>\n<td  width='38%' bgcolor='transparent'>\n<p>&#160;<\/p>\n<p>\u00b7 500 kV Jauru Substation<\/p>\n<p>\u00b7 500 kV Jauru (MT) &#8211; Cuiab\u00e1 (MT) LT&#160; and a <st1:metricconverter w:st='on' ProductID='335 km'>335 km<\/st1:metricconverter> extension<\/p>\n<p>\u00b7 500 kV Cuiab\u00e1 (MT) &#8211;&#160; Rio Araguaia (GO) LT and a <st1:metricconverter w:st='on' ProductID='380 km'>380 km<\/st1:metricconverter> extension<\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='7%' bgcolor='transparent'>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>D<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p>&#160;<\/p>\n<\/td>\n<td  width='38%' bgcolor='transparent'>\n<p>&#160;<\/p>\n<p>&#160;<\/p>\n<p>&#160;<\/p>\n<p>&#160;<\/p>\n<p>&#160;<\/p>\n<p>&#160;<\/p>\n<p>\u00b7 600 kV Porto Velho (RO) &#8211; Ji Paran\u00e1 (RO) Receiving LT and a <st1:metricconverter w:st='on' ProductID='2,375 km'>2,375 km<\/st1:metricconverter> extension (first line circuit);<\/p>\n<p>&#160;<\/p>\n<p>&#160;<\/p>\n<p>&#160;<\/p>\n<p>&#160;<\/p>\n<\/td>\n<td  width='7%' bgcolor='transparent'>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>D<\/p>\n<\/td>\n<td  width='38%' bgcolor='transparent'>\n<p>\u00b7 500 kV Rio Araguaia Substation (GO)<\/p>\n<p>\u00b7 500 kV Rio Araguia (RO) &#8211; \u00c1gua Vermelha 2 (SP) LT and a <st1:metricconverter w:st='on' ProductID='400 km'>400 km<\/st1:metricconverter> extension;<\/p>\n<p>\u00b7 500 kV \u00c1gua Vermelha 2 (SP) substation<\/p>\n<p>\u00b7 500 kV \u00c1gua Vermelha 2 (SP) &#8211; Araraquara (SP) LT and a <st1:metricconverter w:st='on' ProductID='320 km'>320 km<\/st1:metricconverter> extension<\/p>\n<p>\u00b7 500 kV \u00c1gua Vermelha 2 (SP) &#8211; \u00c1gua Vermelha (SP) LT and a <st1:metricconverter w:st='on' ProductID='5 km'>5 km<\/st1:metricconverter> extension<\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='7%' bgcolor='transparent'>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>E<\/p>\n<\/td>\n<td  width='38%' bgcolor='transparent'>\n<p>\u00b7 500\/440 kV Araraquara (SP) substation<\/p>\n<p>\u00b7 500 kV Araraquara (SP) &#8211; Araraquara de Furnas (SP) LT and a <st1:metricconverter w:st='on' ProductID='15 km'>15 km<\/st1:metricconverter> extension<\/p>\n<p>&#160;<\/p>\n<p>\u00b7 440 kV Araraquara (SP) &#8211; Cteep (SP) LT and a <st1:metricconverter w:st='on' ProductID='15 km'>15 km<\/st1:metricconverter> extension<\/p>\n<\/td>\n<td  width='7%' bgcolor='transparent'>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>E<\/p>\n<\/td>\n<td  width='38%' bgcolor='transparent'>\n<p>\u00b7 500\/440 kV Araraquara (SP) substation<\/p>\n<p>\u00b7 500 kV Araraquara (SP) &#8211; Araraquara de Furnas (SP) LT and a <st1:metricconverter w:st='on' ProductID='15 km'>15 km<\/st1:metricconverter> extension<\/p>\n<p>&#160;<\/p>\n<p>\u00b7 440 kV Araraquara (SP) &#8211; Cteep (SP) LT and a <st1:metricconverter w:st='on' ProductID='15 km'>15 km<\/st1:metricconverter> extension<\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='7%' bgcolor='transparent'>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>F<\/p>\n<\/td>\n<td  width='38%' bgcolor='transparent'>\n<p>\u00b7 02 AC\/DC, 500\/\u00b1600 kV Converter Station<\/p>\n<p>\u00b7 02 AC\/DC, 600\/\u00b1500 kV Inverter Station<\/p>\n<\/td>\n<td  width='7%' bgcolor='transparent'>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>F<\/p>\n<\/td>\n<td  width='38%' bgcolor='transparent'>\n<p>\u00b7 02 AC\/DC, 500\/\u00b1600 kV Converter Station<\/p>\n<p>\u00b7 02 AC\/DC, 600\/\u00b1500 kV Inverter Station<\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='7%' bgcolor='transparent'>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>G<\/p>\n<\/td>\n<td  width='38%' bgcolor='transparent'>\n<p>\u00b7 \u00b1600 kV Porto Velho (RO) &#8211; Araraquara (SP) receiving LT and a <st1:metricconverter w:st='on' ProductID='2,375 km'>2,375 km<\/st1:metricconverter> extension<br \/>(second line circuit);<\/p>\n<\/td>\n<td  width='7%' bgcolor='transparent'>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>&#160;<\/p>\n<p  align='center'>G<\/p>\n<\/td>\n<td  width='38%' bgcolor='transparent'>\n<p>\u00b7 \u00b1600 kV Porto Velho (RO) &#8211; Araraquara (SP) receiving LT and a <st1:metricconverter w:st='on' ProductID='2,375 km'>2,375 km<\/st1:metricconverter> extension<br \/>(second line circuit);<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL Electric Energy National Agency (Aneel) approved today (07\/08), in a referee board of directors&#8217; meeting, the instatement of a documental Public Hearing to obtain contributions to 007\/2008 auction notice proposal for enterprises that shall connect power plants from Madeira River Hydroelectric Complex power plants, in Rond\u00f4nia to the National Interlinked System (SIN). Bid [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/14069"}],"collection":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=14069"}],"version-history":[{"count":0,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/14069\/revisions"}],"wp:attachment":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=14069"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=14069"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=14069"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}