{"id":13949,"date":"2008-09-24T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-2766","status":"publish","type":"post","link":"https:\/\/sindenergia.com.br\/seminario\/?p=13949","title":{"rendered":"Leil\u00e3o de energia nova A-5 ter\u00e1 a participa\u00e7\u00e3o de 51 empreendimentos de gera\u00e7\u00e3o"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=2766&#038;id_area=90'><b>ANEEL<\/b><\/a><\/p>\n<p><font face='Verdana, Helvetica' size='2'>O leil\u00e3o de energia nova A-5, previsto para o pr\u00f3ximo dia 30 de setembro, ter\u00e1 a participa\u00e7\u00e3o de 51 empreendimentos de gera\u00e7\u00e3o que se inscreveram e depositaram as garantias previstas no edital de licita\u00e7\u00e3o. A rela\u00e7\u00e3o divulgada pela Comiss\u00e3o Especial da Licita\u00e7\u00e3o da Ag\u00eancia Nacional de Energia El\u00e9trica (Aneel), por meio de adendo ao edital, inclui 49 usinas termel\u00e9tricas, a hidrel\u00e9trica Baixo Igua\u00e7u (PR) e a central geradora e\u00f3lica Delta do Parna\u00edba (PI). Veja&#160;<u><a title='http:\/\/www.aneel.gov.br\/arquivos\/PDF\/VENDERORAS e COMPRADORAS Aptas a participar do Leilao__A-5__24-09-08.pdf' href='http:\/\/www.aneel.gov.br\/arquivos\/PDF\/VENDERORAS%20e%20COMPRADORAS%20Aptas%20a%20participar%20do%20Leilao__A-5__24-09-08.pdf'>aqui<\/a><\/u>&#160;a lista das usinas aptas a participar do leil\u00e3o.<\/font><\/p>\n<p align='justify'><font face='Verdana, Helvetica' size='2'>Todos os empreendimentos inscritos foram tecnicamente habilitados pela Empresa de Pesquisa Energ\u00e9tica (EPE). No caso espec\u00edfico de Baixo Igua\u00e7u, a inclus\u00e3o foi poss\u00edvel porque a usina obteve, no prazo previsto, a licen\u00e7a pr\u00e9via do \u00f3rg\u00e3o ambiental necess\u00e1ria \u00e0 participa\u00e7\u00e3o no certame.<\/font><\/p>\n<p align='justify'><font face='Verdana, Helvetica' size='2'>O A-5 vai negociar contratos de comercializa\u00e7\u00e3o de energia el\u00e9trica com in\u00edcio de suprimento em janeiro de 2013. Em todos os casos previstos no edital, as outorgas de concess\u00e3o (hidrel\u00e9tricas) e autoriza\u00e7\u00e3o (termel\u00e9tricas, PCHs, e\u00f3licas e amplia\u00e7\u00f5es de empreendimentos existentes) est\u00e3o condicionadas \u00e0 negocia\u00e7\u00e3o de energia no leil\u00e3o.<\/font><\/p>\n<p align='justify'><font face='Verdana, Helvetica' size='2'>Pelas regras estabelecidas, poder\u00e3o ser assinadas duas modalidades de Contrato de Comercializa\u00e7\u00e3o de Energia El\u00e9trica no Ambiente Regulado (CCEAR): por quantidade* (empreendimentos de fonte h\u00eddrica) e por disponibilidade** (demais fontes).<\/font><\/p>\n<p align='justify'><font face='Verdana, Helvetica' size='2'>O pre\u00e7o-teto definido no of\u00edcio MME n\u00ba 1249\/2008, do Minist\u00e9rio de Minas e Energia, para as termel\u00e9tricas e a usina e\u00f3lica ser\u00e1 de R$ 146,00 por megawatt-hora (MWh). J\u00e1 o Pre\u00e7o de Refer\u00eancia de Baixo Igua\u00e7u ficar\u00e1 em R$ 123,00 MWh .<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>Os compradores ser\u00e3o as concession\u00e1rias de distribui\u00e7\u00e3o de energia el\u00e9trica que declararam ao MME suas necessidades de compra de energia el\u00e9trica para 2013 at\u00e9 10 de mar\u00e7o \u00faltimo, e ratificaram ou retificaram essas declara\u00e7\u00f5es at\u00e9 29 de abril deste ano, de acordo com as Portarias MME n\u00ba<\/font> <a href='http:\/\/www.aneel.gov.br\/cedoc\/prt2008083mme.pdf'><u><font face='Verdana, Helvetica' color='#0000ff' size='2'>83\/2008<\/font><\/u><\/a> <font face='Verdana, Helvetica' size='2'>e n\u00ba<\/font> <a href='http:\/\/www.aneel.gov.br\/cedoc\/prt2008158mme.pdf'><u><font face='Verdana, Helvetica' color='#0000ff' size='2'>158\/2008<\/font><\/u><\/a><font face='Verdana, Helvetica' size='2'>. O A-5 est\u00e1 previsto na Lei n\u00ba<\/font> <a href='http:\/\/www.planalto.gov.br\/ccivil_03\/_Ato2004-2006\/2004\/Lei\/L10.848.htm'><u><font face='Verdana, Helvetica' color='#0000ff' size='2'>10.848\/2004<\/font><\/u><\/a><font face='Verdana, Helvetica' size='2'>, no Decreto n\u00ba<\/font> <a href='http:\/\/www.planalto.gov.br\/ccivil_03\/_Ato2004-2006\/2004\/Decreto\/D5163.htm'><u><font face='Verdana, Helvetica' color='#0000ff' size='2'>5.163\/2004<\/font><\/u><\/a> <font face='Verdana, Helvetica' size='2'>e na Portaria MME n\u00ba<\/font> <a href='http:\/\/www.aneel.gov.br\/cedoc\/prt2007331mme.pdf'><u><font face='Verdana, Helvetica' color='#0000ff' size='2'>331\/2007<\/font><\/u><\/a><font face='Verdana, Helvetica' size='2'>.<\/font><\/p>\n<p><font face='Verdana, Helvetica' size='2'>O edital e os demais documentos relacionados \u00e0 licita\u00e7\u00e3o est\u00e3o dispon\u00edveis no endere\u00e7o eletr\u00f4nico<\/font> <a href='http:\/\/www.aneel.gov.br\/'><u><font face='Verdana, Helvetica' color='#0000ff' size='2'>www.aneel.gov.br<\/font><\/u><\/a><font face='Verdana, Helvetica' size='2'>, no link<\/font> <a href='http:\/\/www.aneel.gov.br\/aplicacoes\/editais_geracao\/documentos_editais.cfm?IdProgramaEdital=67'><u><font face='Verdana, Helvetica' color='#0000ff' size='2'>Editais de Gera\u00e7\u00e3o\/Leil\u00e3o 003\/2008<\/font><\/u><\/a><font face='Verdana, Helvetica' size='2'>do perfil &#8216;<\/font><a href='http:\/\/www.aneel.gov.br\/areaPerfil.cfm?idPerfil=5'><u><font face='Verdana, Helvetica' color='#0000ff' size='2'>Espa\u00e7o do Empreendedor<\/font><\/u><\/a><font face='Verdana, Helvetica' size='2'>&#8216;.<\/font><\/p>\n<p>&#160;<\/p>\n<p><b><font face='Verdana, Helvetica' size='2'>*Contrato por quantidade &#8211;<\/font> <font face='Verdana, Helvetica' size='2'>considera o montante de energia associado \u00e0 pot\u00eancia instalada da usina que \u00e9 pass\u00edvel de contrata\u00e7\u00e3o.<br \/>**Contrato por disponibilidade &#8211; lastreado na possibilidade de gera\u00e7\u00e3o do empreendimento a partir da exist\u00eancia da fonte de energia. Essa fonte, no caso de termel\u00e9tricas, pode ser derivados de petr\u00f3leo, g\u00e1s natural e res\u00edduos de material org\u00e2nico. No caso das e\u00f3licas, o vento e, das solares, o sol.<\/font><\/b><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL O leil\u00e3o de energia nova A-5, previsto para o pr\u00f3ximo dia 30 de setembro, ter\u00e1 a participa\u00e7\u00e3o de 51 empreendimentos de gera\u00e7\u00e3o que se inscreveram e depositaram as garantias previstas no edital de licita\u00e7\u00e3o. A rela\u00e7\u00e3o divulgada pela Comiss\u00e3o Especial da Licita\u00e7\u00e3o da Ag\u00eancia Nacional de Energia El\u00e9trica (Aneel), por meio de adendo [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/13949"}],"collection":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13949"}],"version-history":[{"count":0,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/13949\/revisions"}],"wp:attachment":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13949"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13949"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13949"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}