{"id":13858,"date":"2008-11-26T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-2857","status":"publish","type":"post","link":"https:\/\/sindenergia.com.br\/seminario\/?p=13858","title":{"rendered":"Madeiratransmission lines with Direct Current technology"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=2857&#038;id_area=90'><b>ANEEL<\/b><\/a><\/p>\n<p  ><i>The auction competition defined the technology option and had average depreciation of 7.15%.<\/i><\/p>\n<p>&#160;<\/p>\n<p>The auction regarding the transmission lines of Rio Madeira Hydroelectric Complex was held today (Nov. 26) by the Brazilian Electricity Regulatory Agency (Aneel), with the negotiation of seven lots bought a private company and two consortiums with the participation of State companies. The public session that lasted around two hours was conducted by BM&amp;F Bovespa at the stock exchange in <st1:place w:st='on'><st1:City w:st='on'>Rio de Janeiro<\/st1:City><\/st1:place>. The winning proposals presented depreciation ranging from 0.001% to 29.50% and resulted in average depreciation of 7.15%, the lowest in the last seven years.<\/p>\n<p>In a press conference, the general director of Aneel, Jerson Kelman, declared that &#8216;the lowest depreciation is the result of well adjusted price and less competition than in other auctions. This auction admitted the technology competition and the option of lowest cost to the consumer was the winner&#8217;.<\/p>\n<p>The press conference also had the participation of the executive secretary of the Ministry of Mines and Energy, M\u00e1rcio Zimmerman, and directors of Aneel Jos\u00e9 Guilherme Senna and Jo\u00edsa Campanher Dutra, the president of Aneel Bid Commission, H\u00e9lvio Guerra, the superintendent of Aneel Transmission Concessions, Jandir Nascimento, and representatives of winning companies and consortiums.<\/p>\n<p><b>Dispute<\/b> &#8211; The auction was held in two phases. In the first one, the technology option was selected &#8211; the Direct Current (DC) option, which will be applied to all lots (A to E). The hybrid option (HB) was discarded for having an invalid proposal. There was no offer to lot B.<\/p>\n<p>After the technology option selection, the second phase followed the criteria of Aneel for transmission auction: the lowest tariff wins. That is, the lowest Annual Revenue Permitted (RAP) for the provision of transmission services.<\/p>\n<p>The concessions of lots A, C and G were bought by Cons\u00f3rcio Integra\u00e7\u00e3o Norte Brasil, composed of Eletronorte (24.50%), Eletrosul (24.50%), Abengoa Brasil (25.50%) and Andrade Gutierrez Part (25.50%). The group offered R$ 44.751.600,00 for lot A, which represented depreciation of 0.001% in relation to the Annual Revenue Permitted (RAP) of the invitation to bid. The winning proposal for lot C was R$ 144.754.800,00, depreciation of 10%. The consortium bought the concession of lot G with the proposal of R$ 173.922.000,00. This amount represented 6% reduction in relation to the RAP.<\/p>\n<p>Lots B and E were bought by private company Cymi Holding S\/A, with proposals of R$ 35.447.808,00 and R$ 15.463.152,00, respectively. The depreciations in these cases were 15% and 29.50%, the latter being the highest in this auction.<\/p>\n<p>Finally, the Cons\u00f3rcio Madeira Transmiss\u00e3o, the group composed of Cteep (51%), Furnas (24.5%) and Chesf (24.5%), was the winner of lots D and F. The winning proposal to lot D was R$ 176.249.000,00, with depreciation of 0.21%. The group proposed R$ 151.788.396,00 for lot F, a depreciation of 10%.<\/p>\n<p><b>Connection to SIN<\/b> &#8211; The transmission lines and substations that comprise <st1:place w:st='on'>Madeira<\/st1:place> interconnection will have around 2,375 km extension until the connection to the National Interconnected System (SIN). The commercial operations of the installations are planned to start within 36 to 50 months from the signature of concession contracts. The estimated investments in all lots made by Empresa de Pesquisa Energ\u00e9tica (EPE) are R$ 7,2 billion.<\/p>\n<p>The period of transmission concessions is 30 years. At the auction, the winning companies and consortiums were those that offered the lowest tariff, i.e., the lowest Annual Revenue Permitted (RAP) for the service provision. The depreciations between the annual revenue permitted determined in the invitation to bid and the proposals at the auction will result in benefits to the end consumer of the power distributors and contribute to increased competitiveness in the national production sector.<\/p>\n<p>See below the winners of each lot and the details of the concessions that were auctioned today:<\/p>\n<p><b>Lot A &#8211; DC<\/b><\/p>\n<table class='MsoNormalTable'  cellspacing='1' cellpadding='0' border='1'>\n<tbody>\n<tr >\n<td  width='65%' bgcolor='transparent'>\n<p  align='center'><b>Project<\/b><\/p>\n<\/td>\n<td  width='17%' bgcolor='transparent'>\n<p  align='center'><b>Voltage (kV)<\/b><\/p>\n<\/td>\n<td  width='19%' bgcolor='transparent'>\n<p  align='center'><b>Approx. Extension (km)<\/b><\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='65%' bgcolor='transparent'>\n<p>SE Coletora Porto Velho (Collecting Substation)<\/p>\n<\/td>\n<td  width='17%' bgcolor='transparent'>\n<p  align='center'>500\/230 kV<\/p>\n<\/td>\n<td  width='19%' bgcolor='transparent'>\n<p  align='center'>&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='65%' bgcolor='transparent'>\n<p>2 converting stations AC\/DC\/AC<\/p>\n<\/td>\n<td  width='17%' bgcolor='transparent'>\n<p  align='center'>&#8211;<\/p>\n<\/td>\n<td  width='19%' bgcolor='transparent'>\n<p  align='center'>&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='65%' bgcolor='transparent'>\n<p>LT Coletora Porto Velho (RO) &#8211; Porto Velho (RO) (Collecting Substation)<\/p>\n<\/td>\n<td  width='17%' bgcolor='transparent'>\n<p  align='center'>230 kV<\/p>\n<\/td>\n<td  width='19%' bgcolor='transparent'>\n<p  align='center'>17.3<\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='65%' bgcolor='transparent'>\n<p  >&#160;<\/p>\n<\/td>\n<td  width='17%' bgcolor='transparent'>\n<p  align='center'><b>Total<\/b><\/p>\n<\/td>\n<td  width='19%' bgcolor='transparent'>\n<p  align='center'><b>17.3<\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p  >&#160;<\/p>\n<p><b>Winner:<\/b> Cons\u00f3rcio Integra\u00e7\u00e3o Norte Brasil (Eletronorte &#8211; 24.50% &#8211; Leader; Eletrosul &#8211; 24.50%; Abengoa Brasil &#8211; 25.50%; Andrade Gutierrez Par &#8211; 25.50%).<\/p>\n<p><b>Proposal:<\/b> R$ 44.751.600,00, a depreciation in relation to the Annual Revenue Permitted (RAP) established in the invitation to bid of R$ 44.751.920,00.<\/p>\n<p><b>Location:<\/b> Rond\u00f4nia<\/p>\n<p><b>Start of commercial operation:<\/b> within 36 months<\/p>\n<p>&#160;<\/p>\n<p><b>Lot B &#8211; DC<\/b><\/p>\n<table class='MsoNormalTable'  cellspacing='1' cellpadding='0' border='1'>\n<tbody>\n<tr >\n<td  width='65%' bgcolor='transparent'>\n<p  align='center'><b>Project<\/b><\/p>\n<\/td>\n<td  width='17%' bgcolor='transparent'>\n<p  align='center'><b>Voltage (kV)<\/b><\/p>\n<\/td>\n<td  width='19%' bgcolor='transparent'>\n<p  align='center'><b>Approx. Extension (km)<\/b><\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='65%' bgcolor='transparent'>\n<p>LT Cuiab\u00e1 (MT) &#8211; Ribeir\u00e3ozinho (MT)<\/p>\n<\/td>\n<td  width='17%' bgcolor='transparent'>\n<p  align='center'>500<\/p>\n<\/td>\n<td  width='19%' bgcolor='transparent'>\n<p  align='center'>360<\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='65%' bgcolor='transparent'>\n<p>LT Ribeir\u00e3ozinho (MT) &#8211; Rio Verde Norte (GO)<\/p>\n<\/td>\n<td  width='17%' bgcolor='transparent'>\n<p  align='center'>500<\/p>\n<\/td>\n<td  width='19%' bgcolor='transparent'>\n<p  align='center'>242<\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='65%' bgcolor='transparent'>\n<p  >&#160;<\/p>\n<\/td>\n<td  width='17%' bgcolor='transparent'>\n<p  align='center'><b>Total<\/b><\/p>\n<\/td>\n<td  width='19%' bgcolor='transparent'>\n<p  align='center'><b>602<\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p  >&#160;<\/p>\n<p><b>Winner:<\/b> Cymi Holding S\/A (<st1:place w:st='on'><st1:country-region w:st='on'>Brazil<\/st1:country-region><\/st1:place>)<\/p>\n<p><b>Proposal:<\/b> R$ 35.447.808,00, a depreciation of 15% in relation to the Annual Revenue Permitted (RAP) established in the invitation to bid of R$ 41.707.300,00.<\/p>\n<p><b>Location:<\/b> Mato Grosso and Goi\u00e1s<\/p>\n<p><b>Start of commercial operation:<\/b> within 36 months<\/p>\n<p>&#160;<\/p>\n<p><b>Lot C &#8211; DC<\/b><\/p>\n<table class='MsoNormalTable'  cellspacing='1' cellpadding='0' border='1'>\n<tbody>\n<tr >\n<td  width='65%' bgcolor='transparent'>\n<p  align='center'><b>Project<\/b><\/p>\n<\/td>\n<td  width='17%' bgcolor='transparent'>\n<p  align='center'><b>Voltage (kV)<\/b><\/p>\n<\/td>\n<td  width='19%' bgcolor='transparent'>\n<p  align='center'><b>Approx. Extension (km)<\/b><\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='65%' bgcolor='transparent'>\n<p>Rectifier Station 01 AC\/DC<\/p>\n<\/td>\n<td  width='17%' bgcolor='transparent'>\n<p  align='center'>500\/\u00b1600<\/p>\n<\/td>\n<td  width='19%' bgcolor='transparent'>\n<p  align='center'>&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='65%' bgcolor='transparent'>\n<p>Inverter Station 01 DC\/AC<\/p>\n<\/td>\n<td  width='17%' bgcolor='transparent'>\n<p  align='center'>\u00b1600\/500<\/p>\n<\/td>\n<td  width='19%' bgcolor='transparent'>\n<p  align='center'>&#8211;<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p  >&#160;<\/p>\n<p><b>Winner:<\/b> Cons\u00f3rcio Integra\u00e7\u00e3o Norte Brasil (Eletronorte &#8211; 24.50% &#8211; Leader; Eletrosul &#8211; 24.50%; Abengoa Brasil &#8211; 25.50%; Andrade Gutierrez Par &#8211; 25.50%).<\/p>\n<p><b>Proposal:<\/b> R$ 144.754.800,00, a depreciation of 10% in relation to the Annual Revenue Permitted (RAP) established in the invitation to bid of R$ 160.838.780,00.<\/p>\n<p><b>Location:<\/b> Rond\u00f4nia and <st1:place w:st='on'><st1:City w:st='on'>S\u00e3o Paulo<\/st1:City><\/st1:place><\/p>\n<p><b>Start of commercial operation:<\/b> within 38 months<\/p>\n<p>&#160;<\/p>\n<p><b>Lot D &#8211; DC<\/b><\/p>\n<table class='MsoNormalTable'  cellspacing='1' cellpadding='0' border='1'>\n<tbody>\n<tr >\n<td  width='66%' bgcolor='transparent'>\n<p  align='center'><b>Project<\/b><\/p>\n<\/td>\n<td  width='16%' bgcolor='transparent'>\n<p  align='center'><b>Voltage (kV)<\/b><\/p>\n<\/td>\n<td  width='18%' bgcolor='transparent'>\n<p  align='center'><b>Approx. Extension (km)<\/b><\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='66%' bgcolor='transparent'>\n<p>LT Coletora Porto Velho (RO) &#8211; Araraquara 2 (SP), N\u00ba 01<\/p>\n<\/td>\n<td  width='16%' bgcolor='transparent'>\n<p  align='center'>\u00b1600<\/p>\n<\/td>\n<td  width='18%' bgcolor='transparent'>\n<p  align='center'>2,375<\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='66%' bgcolor='transparent'>\n<p  >&#160;<\/p>\n<\/td>\n<td  width='16%' bgcolor='transparent'>\n<p  align='center'><b>Total<\/b><\/p>\n<\/td>\n<td  width='18%' bgcolor='transparent'>\n<p  align='center'><b>2,375<\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p  >&#160;<\/p>\n<p><b>Winner:<\/b> Cons\u00f3rcio Madeira Transmiss\u00e3o (Cteep &#8211; 51% &#8211; Leader; Furnas &#8211; 24.5%; Chesf &#8211; 24.5%)<\/p>\n<p><b>Proposal:<\/b> R$ 176.249.000,00, a depreciation of 0.21% in relation to the Annual Revenue Permitted (RAP) established in the invitation to bid of R$ 176.626.410,00.<\/p>\n<p><b>Location:<\/b> Rond\u00f4nia, Mato Grosso, Goi\u00e1s, Minas Gerais and S\u00e3o Paulo<\/p>\n<p><b>Start of commercial operation:<\/b> within 36 months<\/p>\n<p>&#160;<\/p>\n<p><st1:place w:st='on'><b>Lot<\/b><\/st1:place><b>E &#8211; DC<\/b><\/p>\n<table class='MsoNormalTable'  cellspacing='1' cellpadding='0' border='1'>\n<tbody>\n<tr >\n<td  width='66%' bgcolor='transparent'>\n<p  align='center'><b>Project<\/b><\/p>\n<\/td>\n<td  width='16%' bgcolor='transparent'>\n<p  align='center'><b>Voltage (kV)<\/b><\/p>\n<\/td>\n<td  width='18%' bgcolor='transparent'>\n<p  align='center'><b>Approx. Extension (km)<\/b><\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='66%' bgcolor='transparent'>\n<p>SE Araraquara 2 (SP) &#8211; 3750 MVA<\/p>\n<\/td>\n<td  width='16%' bgcolor='transparent'>\n<p  align='center'>500\/440<\/p>\n<\/td>\n<td  width='18%' bgcolor='transparent'>\n<p  align='center'>&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='66%' bgcolor='transparent'>\n<p>LT Araraquara 2 (SP) &#8211; Araraquara de Furnas (SP), C1 and C2<\/p>\n<\/td>\n<td  width='16%' bgcolor='transparent'>\n<p  align='center'>500<\/p>\n<\/td>\n<td  width='18%' bgcolor='transparent'>\n<p  align='center'>15<\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='66%' bgcolor='transparent'>\n<p>LT Arararaquara 2(SP) &#8211; Araraquara Cteep (SP), C1 and C2<\/p>\n<\/td>\n<td  width='16%' bgcolor='transparent'>\n<p  align='center'>440<\/p>\n<\/td>\n<td  width='18%' bgcolor='transparent'>\n<p  align='center'>15<\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='66%' bgcolor='transparent'>\n<p  >&#160;<\/p>\n<\/td>\n<td  width='16%' bgcolor='transparent'>\n<p  align='center'><b>Total<\/b><\/p>\n<\/td>\n<td  width='18%' bgcolor='transparent'>\n<p  align='center'><b>30<\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p  >&#160;<\/p>\n<p><b>Winner:<\/b> Cymi Holding S\/A (<st1:place w:st='on'><st1:country-region w:st='on'>Brazil<\/st1:country-region><\/st1:place>)<\/p>\n<p><b>Lance:<\/b> R$ 15.463.152,00, a depreciation of 29.50% in relation to the Annual Revenue Permitted (RAP) established in the invitation to bid of R$ 21.933.550,00.<\/p>\n<p><b>Location:<\/b> <st1:place w:st='on'><st1:City w:st='on'>S\u00e3o Paulo<\/st1:City><\/st1:place><\/p>\n<p><b>Start of commercial operation:<\/b> within 36 months<\/p>\n<p>&#160;<\/p>\n<p><b>Lot F &#8211; DC<\/b><\/p>\n<table class='MsoNormalTable'  cellspacing='1' cellpadding='0' border='1'>\n<tbody>\n<tr >\n<td  width='66%' bgcolor='transparent'>\n<p  align='center'><b>Project<\/b><\/p>\n<\/td>\n<td  width='16%' bgcolor='transparent'>\n<p  align='center'><b>Voltage (kV)<\/b><\/p>\n<\/td>\n<td  width='18%' bgcolor='transparent'>\n<p  align='center'><b>Approx. Extension (km)<\/b><\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='66%' bgcolor='transparent'>\n<p>Rectifier Station 02 AC\/DC<\/p>\n<\/td>\n<td  width='16%' bgcolor='transparent'>\n<p  align='center'>500\/\u00b1600<\/p>\n<\/td>\n<td  width='18%' bgcolor='transparent'>\n<p  align='center'>&#8211;<\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='66%' bgcolor='transparent'>\n<p>Inverter Station 02 DC\/AC<\/p>\n<\/td>\n<td  width='16%' bgcolor='transparent'>\n<p  align='center'>\u00b1600\/500<\/p>\n<\/td>\n<td  width='18%' bgcolor='transparent'>\n<p  align='center'>&#8211;<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p  >&#160;<\/p>\n<p><b>Winner:<\/b> Cons\u00f3rcio Madeira Transmiss\u00e3o (Cteep &#8211; 51% &#8211; Leader; Furnas &#8211; 24.5%; Chesf &#8211; 24.5%)<\/p>\n<p><b>Proposal:<\/b> R$ 151.788.396,00 a depreciation of 10% in relation to the Annual Revenue Permitted (RAP) established in the invitation to bid of R$ 168.653.770,00.<\/p>\n<p><b>Location:<\/b> Rond\u00f4nia and <st1:place w:st='on'><st1:City w:st='on'>S\u00e3o Paulo<\/st1:City><\/st1:place><\/p>\n<p><b>Start of commercial operation:<\/b> within 50 months<\/p>\n<p>&#160;<\/p>\n<p><b>Lot G &#8211; DC<\/b><\/p>\n<table class='MsoNormalTable'  cellspacing='1' cellpadding='0' border='1'>\n<tbody>\n<tr >\n<td  width='66%' bgcolor='transparent'>\n<p  align='center'><b>Project<\/b><\/p>\n<\/td>\n<td  width='16%' bgcolor='transparent'>\n<p  align='center'><b>Voltage (kV)<\/b><\/p>\n<\/td>\n<td  width='18%' bgcolor='transparent'>\n<p  align='center'><b>Approx. Extension (km)<\/b><\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='66%' bgcolor='transparent'>\n<p>LT Coletora Porto Velho (RO) &#8211; Araraquara 2 (SP), n\u00ba02<\/p>\n<\/td>\n<td  width='16%' bgcolor='transparent'>\n<p  align='center'>\u00b1600 KV<\/p>\n<\/td>\n<td  width='18%' bgcolor='transparent'>\n<p  align='center'>2,375<\/p>\n<\/td>\n<\/tr>\n<tr >\n<td  width='66%' bgcolor='transparent'>\n<p  >&#160;<\/p>\n<\/td>\n<td  width='16%' bgcolor='transparent'>\n<p  align='center'><b>Total<\/b><\/p>\n<\/td>\n<td  width='18%' bgcolor='transparent'>\n<p  align='center'><b>2,375<\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p  >&#160;<\/p>\n<p><b>Winner:<\/b> Cons\u00f3rcio Integra\u00e7\u00e3o Norte Brasil (Eletronorte &#8211; 24.50% &#8211; Leader; Eletrosul &#8211; 24.50%; Abengoa Brasil &#8211; 25.50%; Andrade Gutierrez Par &#8211; 25.50%).<\/p>\n<p><b>Proposal:<\/b> R$ 173.922.000,00, a depreciation of 6% in relation to the Annual Revenue Permitted (RAP) established in the invitation to bid of R$ 185.023.960,00.<\/p>\n<p><b>Location:<\/b> Rond\u00f4nia, Mato Grosso, Goi\u00e1s, Minas Gerais and S\u00e3o Paulo<\/p>\n<p><b>Start of commercial operation:<\/b> within 48 months<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL The auction competition defined the technology option and had average depreciation of 7.15%. &#160; The auction regarding the transmission lines of Rio Madeira Hydroelectric Complex was held today (Nov. 26) by the Brazilian Electricity Regulatory Agency (Aneel), with the negotiation of seven lots bought a private company and two consortiums with the participation [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/13858"}],"collection":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13858"}],"version-history":[{"count":0,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/13858\/revisions"}],"wp:attachment":[{"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13858"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13858"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13858"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}