{"id":15123,"date":"2005-11-21T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-1592","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=15123","title":{"rendered":"LISTA DA 66\u00aa SESS\u00c3O P\u00daBLICA DE SORTEIO DE 2005 &#8211; RELATORES SORTEADOS"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=1592&#038;id_area=90'><b>ANEEL<\/b><\/a><\/p>\n<p><b>Data:<\/b> 21\/11\/2005.<br \/><b>Local:<\/b> Sala de Reuni\u00e3o da Diretoria do Ed. Sede da ANEEL &#8211; SGAN 603-M\u00f3dulo I &#8211; Bras\u00edlia &#8211; DF.<br \/><font face='Times New Roman' size='3'><strong>In\u00edcio:<\/strong> 8 h 30&#8217;.<\/p>\n<p>RELA\u00c7\u00c3O DOS PROCESSOS PARA SORTEIO DE DIRETOR-RELATOR.<\/p>\n<p><\/font><\/p>\n<p><b>1.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;<\/b> <b>Processo n\u00b0 48500.001383\/05-16.<\/b> Autoriza\u00e7\u00e3o, com fins de regulariza\u00e7\u00e3o, para a Companhia Industrial Fluminense &#8211; CIF estabelecer-se como Autoprodutor de Energia El\u00e9trica, mediante a explora\u00e7\u00e3o da PCH Caranda\u00ed, localizada no Estado de Minas Gerais. &#8211; \u00c1rea Respons\u00e1vel: <strong>SCG<\/strong><b>.<br \/><\/b><b>Diretor-Relator sorteado: Dr. Jaconias de Aguiar.<\/p>\n<p><\/b><b>2.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;<\/b> <b>Processo n\u00b0 48500.001162\/85-47.<\/b> Altera\u00e7\u00e3o do art. 1\u00ba da Resolu\u00e7\u00e3o n\u00ba 468, de 31 de outubro de 2001, que transferiu a concess\u00e3o da PCH Costa Rica, para a empresa Costa Rica Energ\u00e9tica Ltda., localizada no Estado de Mato Grosso do Sul. &#8211; \u00c1rea Respons\u00e1vel: <strong>SCG<\/strong><b>.<br \/><\/b><b>Diretor-Relator sorteado: Dr. Isaac Pinto Averbuch.<\/p>\n<p><\/b><b>3.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;<\/b> <b>Processo n\u00b0 48500.001931\/02-47.<\/b> Revoga\u00e7\u00e3o da Resolu\u00e7\u00e3o Autorizativa ANEEL n\u00ba 208, de 5 de maio de 2004, que autorizou a empresa Batistella Ind\u00fastria e Com\u00e9rcio Ltda. a estabelecer-se como Produtor Independente de Energia El\u00e9trica, mediante a explora\u00e7\u00e3o da UTE Batistella, localizada do Estado de Santa Catarina. &#8211; \u00c1rea Respons\u00e1vel: <strong>SCG<\/strong><b>.<br \/><\/b><b>Diretor-Relator sorteado: Dr. Jaconias de Aguiar.<\/p>\n<p><\/b><b>4.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;<\/b> <b>Processo n\u00b0 48500.005548\/05-56.<\/b> Declara\u00e7\u00e3o de utilidade p\u00fablica, para fins de institui\u00e7\u00e3o de servid\u00e3o administrativa, em favor do Cons\u00f3rcio Capim Branco Energia &#8211; CCBE, das \u00e1reas de terras necess\u00e1rias \u00e0 passagem das Linhas de Transmiss\u00e3o Capim Branco II &#8211; Emborca\u00e7\u00e3o, Araguari 2 &#8211; Capim Branco II, Capim Branco II &#8211; Uberl\u00e2ndia 7 e Capim Branco II &#8211; Uberl\u00e2ndia 1, localizadas no Estado de Minas Gerais. &#8211; \u00c1rea Respons\u00e1vel: <strong>SCT.<br \/><\/strong><b>Diretor-Relator sorteado: Dr. Isaac Pinto Averbuch.<\/p>\n<p><\/b><b>5.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;<\/b> <b>Processo n\u00b0 48500.005062\/02-10.<\/b> Proposta de Regulamenta\u00e7\u00e3o do art. 21 da Resolu\u00e7\u00e3o Normativa n\u00ba 63\/2004, que prev\u00ea a possibilidade de celebra\u00e7\u00e3o de Termo de Compromisso de Ajuste de Conduta, alternativamente \u00e0 aplica\u00e7\u00e3o de penalidades aos agentes do Setor El\u00e9trico. &#8211; \u00c1rea Respons\u00e1vel: <strong>Assessoria.<br \/><\/strong><b>Diretor-Relator sorteado: Dr. Isaac Pinto Averbuch.<\/p>\n<p><\/b><b>6.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;<\/b> <b>Processo n\u00b0 48500.003417\/02-64.<\/b> Procedimento de cobran\u00e7a dos valores da Recomposi\u00e7\u00e3o Tarif\u00e1ria Extraordin\u00e1ria &#8211; RTE, relativos aos consumidores que tenham passado \u00e0 condi\u00e7\u00e3o de Consumidores Livres<b>.<\/b> &#8211; \u00c1rea Respons\u00e1vel: <strong>SRE<\/strong><b>.<br \/><\/b><b>Diretor-Relator sorteado: Dr. Jaconias de Aguiar.<\/p>\n<p><\/b><b>7.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;<\/b> <b>Processo n\u00b0 48500.005950\/05-86.<\/b> Reconfigura\u00e7\u00e3o dos conjuntos de unidades consumidoras, bem como estabelecimento das metas de continuidade de distribui\u00e7\u00e3o de energia el\u00e9trica da \u00e1rea de concess\u00e3o da Empresa de Eletricidade Vale Paranapanema &#8211; EEVP. &#8211; \u00c1rea Respons\u00e1vel: <strong>SRD<\/strong><b>.<br \/><\/b><b>Diretor-Relator sorteado: Dr. Isaac Pinto Averbuch.<\/p>\n<p><\/b><b>8.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;<\/b> <b>Processo n\u00b0 48500.003830\/04-72.<\/b> Requerimento de anu\u00eancia aos novos contratos de m\u00fatuo celebrados pelas distribuidoras do GRUPO REDE. &#8211; \u00c1rea Respons\u00e1vel: <strong>SFF<\/strong><b>.<br \/><\/b><b>Diretor-Relator sorteado: Dr. Isaac Pinto Averbuch.<\/p>\n<p><\/b><b>9.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;<\/b> <b>Processo n\u00b0 48500.005557\/05-47.<\/b> Homologa\u00e7\u00e3o do reajuste do valor da Tarifa Atualizada de Refer\u00eancia &#8211; TAR para o exerc\u00edcio de 2006<b>.<\/b> &#8211; \u00c1rea Respons\u00e1vel: <strong>SRE<\/strong><b>.<br \/><\/b><b>Diretor-Relator sorteado: Dr. Jaconias de Aguiar.<\/p>\n<p><\/b><b>10.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;<\/b> <b>Processo n\u00b0 48500.000932\/01-93.<\/b> Homologa\u00e7\u00e3o da transfer\u00eancia de a\u00e7\u00f5es que comp\u00f5em o bloco de controle da Energ\u00e9tica Corumb\u00e1 III S\/A. &#8211; \u00c1rea Respons\u00e1vel: <strong>SFF<\/strong><b>.<br \/><\/b><b>Diretor-Relator sorteado: Dr. Jaconias de Aguiar.<\/p>\n<p><\/b><b>11.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;<\/b> <b>Processo n\u00b0 48500.006051\/05-73.<\/b> Homologa\u00e7\u00e3o do reajuste anual contratual das tarifas de compra e venda de energia el\u00e9trica da Companhia Hidro El\u00e9trica do S\u00e3o Francisco &#8211; CHESF para a Companhia Sul Sergipana de Eletricidade &#8211; SULGIPE<b>.<\/b> &#8211; \u00c1rea Respons\u00e1vel: <strong>SRE<\/strong><b>.<br \/><\/b><b>Diretor-Relator sorteado: Dr. Isaac Pinto Averbuch.<\/p>\n<p><\/b><b>12.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;<\/b> <b>Processo n\u00b0 48500.006301\/05-39.<\/b> Homologa\u00e7\u00e3o do reajuste anual contratual das tarifas de compra e venda de energia el\u00e9trica da Empresa Energ\u00e9tica de Sergipe S\/A &#8211; ENERGIPE para a Companhia Sul Sergipana de Eletricidade &#8211; SULGIPE<b>.<\/b> &#8211; \u00c1rea Respons\u00e1vel: <strong>SRE<\/strong><b>.<br \/><\/b><b>Diretor-Relator sorteado: Dr. Isaac Pinto Averbuch.<\/p>\n<p><\/b><b>13.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;<\/b> <b>Processo n\u00b0 48500.006108\/05-99.<\/b> Homologa\u00e7\u00e3o do reajuste anual contratual das tarifas de compra e venda de energia el\u00e9trica de FURNAS Centrais El\u00e9tricas S\/A para a AMPLA Energia e Servi\u00e7os S\/A<b>.<\/b> &#8211; \u00c1rea Respons\u00e1vel: <strong>SRE<\/strong><b>.<br \/><\/b><b>Diretor-Relator sorteado: Dr. Jaconias de Aguiar.<\/p>\n<p><\/b><b>14.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;<\/b> <b>Processo n\u00b0 48500.003315\/05-94.<\/b> Recurso interposto pela Companhia Piratininga de For\u00e7a e Luz &#8211; CPFL PIRATININGA em face da Resolu\u00e7\u00e3o Homologat\u00f3ria ANEEL n\u00ba 228, de 18 de outubro de 2005, que homologou o resultado da primeira revis\u00e3o tarif\u00e1ria peri\u00f3dica da concession\u00e1ria. <b>(<\/b><b>Diretor Relator da Resolu\u00e7\u00e3o Homologat\u00f3ria n\u00ba 228\/2005: Dr.<\/b> <st1:PersonName><b>Isaac Pinto Averbuch<\/b><\/st1:PersonName><b>).<\/b> &#8211; \u00c1rea Respons\u00e1vel: <strong>SGE.<br \/><\/strong><b>Diretor-Relator sorteado: Dr. Jaconias de Aguiar.<\/p>\n<p><\/b><b>15.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;<\/b> <b>Processo n\u00b0 48500.004554\/05-13.<\/b> Recurso interposto pela Companhia Piratininga de For\u00e7a e Luz &#8211; CPFL PIRATININGA em face da Resolu\u00e7\u00e3o Homologat\u00f3ria ANEEL n\u00ba 229, de 18 de outubro de 2005, que homologou as tarifas de fornecimento de energia el\u00e9trica, estabeleceu a receita anual das instala\u00e7\u00f5es de conex\u00e3o, bem como fixou o valor anual da Taxa de Fiscaliza\u00e7\u00e3o de Servi\u00e7os de Energia El\u00e9trica &#8211; TFSEE e as Tarifas de Uso dos Sistemas de Distribui\u00e7\u00e3o &#8211; TUSD. <b>(<\/b><b>Diretor Relator da Resolu\u00e7\u00e3o Homologat\u00f3ria n\u00ba 229\/2005: Dr.<\/b> <st1:PersonName><b>Isaac Pinto Averbuch<\/b><\/st1:PersonName><b>).<\/b> &#8211; \u00c1rea Respons\u00e1vel: <strong>SGE.<br \/><\/strong><b>Diretor-Relator sorteado: Dr. Jaconias de Aguiar.<\/p>\n<p><\/b><b>16.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;<\/b> <b>Processo n\u00b0 48500.003316\/02-57.<\/b> Recurso interposto pela Bandeirante Energia S\/A em face da Resolu\u00e7\u00e3o Homologat\u00f3ria ANEEL n\u00ba 226, de 18 de outubro de 2005, que homologou o resultado da primeira revis\u00e3o tarif\u00e1ria peri\u00f3dica da concession\u00e1ria. <b>(<\/b><b>Diretor Relator da Resolu\u00e7\u00e3o Homologat\u00f3ria n\u00ba 226\/2005: Dr.<\/b> <st1:PersonName><b>Isaac Pinto Averbuch<\/b><\/st1:PersonName><b>).<\/b> &#8211; \u00c1rea Respons\u00e1vel: <strong>SGE.<br \/><\/strong><b>Diretor-Relator sorteado: Dr. Jaconias de Aguiar.<\/p>\n<p><\/b><b>17.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;<\/b> <b>Processo n\u00b0 48500.004545\/05-22.<\/b> Recurso interposto pela Bandeirante Energia S\/A em face da Resolu\u00e7\u00e3o Homologat\u00f3ria ANEEL n\u00ba 227, de 18 de outubro de 2005, que homologou as tarifas de fornecimento de energia el\u00e9trica, estabeleceu a receita anual das instala\u00e7\u00f5es de conex\u00e3o, bem como fixou o valor anual da Taxa de Fiscaliza\u00e7\u00e3o de Servi\u00e7os de Energia El\u00e9trica &#8211; TFSEE e as Tarifas de Uso dos Sistemas de Distribui\u00e7\u00e3o &#8211; TUSD. <b>(<\/b><b>Diretor Relator da Resolu\u00e7\u00e3o Homologat\u00f3ria n\u00ba 227\/2005: Dr.<\/b> <st1:PersonName><b>Isaac Pinto Averbuch<\/b><\/st1:PersonName><b>).<\/b> &#8211; \u00c1rea Respons\u00e1vel: <strong>SGE.<br \/><\/strong><b>Diretor-Relator sorteado: Dr. Jaconias de Aguiar.<\/p>\n<p><\/b><b>18.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;<\/b> <b>Processo n\u00b0 48500.006078\/05-20.<\/b> Recurso interposto pela Companhia Energ\u00e9tica do Cear\u00e1 &#8211; COELCE em face do contido no Processo PCEE\/CDR\/0007\/2005 &#8211; CONSULTA, proferido pela Ag\u00eancia Reguladora de Servi\u00e7os P\u00fablicos Delegados do Estado do Cear\u00e1 &#8211; ARCE, referente \u00e0 consulta realizada pela concession\u00e1ria. &#8211; \u00c1rea Respons\u00e1vel: <strong>SCT.<br \/><\/strong><b>Diretor-Relator sorteado: Dr. Jaconias de Aguiar.<\/p>\n<p><\/b><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL Data: 21\/11\/2005.Local: Sala de Reuni\u00e3o da Diretoria do Ed. Sede da ANEEL &#8211; SGAN 603-M\u00f3dulo I &#8211; Bras\u00edlia &#8211; DF.In\u00edcio: 8 h 30&#8217;. RELA\u00c7\u00c3O DOS PROCESSOS PARA SORTEIO DE DIRETOR-RELATOR. 1.&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160; Processo n\u00b0 48500.001383\/05-16. Autoriza\u00e7\u00e3o, com fins de regulariza\u00e7\u00e3o, para a Companhia Industrial Fluminense &#8211; CIF estabelecer-se como Autoprodutor de Energia El\u00e9trica, mediante [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/15123"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15123"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/15123\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15123"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15123"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15123"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}