{"id":13377,"date":"2010-03-26T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-3338","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=13377","title":{"rendered":"Monitoring of the blackout on November 10th, 2009."},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=3338&#038;id_area=90'><b>ANEEL<\/b><\/a><\/p>\n<p  >Referring to the results of the review on the blackout occurred on November 10<sup>th<\/sup>, 2009, the National Energy Agency (Aneel) reports that there are available at the Agency&#8217;s website the&#160; &#160;<a href='http:\/\/www.aneel.gov.br\/area.cfm?idArea=38&amp;idPerfil=2'><b>documents<\/b><\/a>&#160; associated with the monitoring process of Furnas Power Plants, whose infraction fine, of R$ 53.7 million, was sent to the company on Tuesday (the 23<sup>rd<\/sup>).<\/p>\n<p  >Aneel holds regular checks on generators, distributors and broadcasters throughout the country.&#160; This activity follows an annual schedule and in the technical-commercial mode it evaluates the maintenance of equipment, operations and customer service. In cases such as of the blackout of November 10<sup>th<\/sup>, a point inspection is open to establish the incidents.&#160; During the calculation, the company is notified to make the necessary clarifications, respecting the principle of contradictory and legal defense.<\/p>\n<p>If a failure in the planning, operation or maintenance is found, the penalties range from warnings to fines of up to 2% of the company&#8217;s annual revenue, as required by item 10 of Law&#160; &#160;<a href='http:\/\/www.planalto.gov.br\/ccivil_03\/LEIS\/L9427compilada.htm' target='_blank'><b>9427\/1996,<\/b><\/a>&#160; regulated by Resolution No. 63\/2004 of Aneel.&#160; The penalty does not end the obligation of the agent to make the necessary corrections to correct the problem.&#160; The company can appeal the penalty to the board of Aneel &#8211; which will evaluate resource in a public meeting.&#160; The decision of the board is ultimately at the administrative level.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL Referring to the results of the review on the blackout occurred on November 10th, 2009, the National Energy Agency (Aneel) reports that there are available at the Agency&#8217;s website the&#160; &#160;documents&#160; associated with the monitoring process of Furnas Power Plants, whose infraction fine, of R$ 53.7 million, was sent to the company on [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/13377"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13377"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/13377\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13377"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13377"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13377"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}