{"id":12991,"date":"2011-02-15T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-3724","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=12991","title":{"rendered":"Version of the database to the Distribution Plan for 2011 is available"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=3724&#038;id_area=90'><b>ANEEL<\/b><\/a><br \/>\nThe database for sending information to the Development Plan of Distribution&nbsp;&#12288;&nbsp;(PDD), 2011 (version 1.0.11) is available for&nbsp;<em>download.<\/em>&nbsp;Agents must submit data annually to the Agency by April 10, as planned on Normative Resolution No.&nbsp;<a href='http:\/\/www.aneel.gov.br\/cedoc\/ren2009395.pdf'><strong>395\/2009<\/strong><\/a>, which approves the Distribution Procedures (Prodist).<\/p>\n<p>The Plan presents the results of planning studies of electric and energy utilities and distribution licensees.&nbsp;ANEEL uses this information to monitor the planning and development of systems of power distribution in the country, and use them to assess possible needs for improving the regulations.<\/p>\n<p>The database, along with the PDD-use instructions, is available on the Agency website at:&nbsp;<a href='http:\/\/www.aneel.gov.br\/area.cfm?idArea=96&amp;idPerfil=2'><strong>Technical Info \/ Fees &#8211; Staff of Power Sector \/ Usage Rate of Distribution System \/<\/strong><\/a>&nbsp;&#12288;&nbsp;No attachment files for&nbsp;<em>download.<\/em>&nbsp;(DB\/GL)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL The database for sending information to the Development Plan of Distribution&nbsp;&#12288;&nbsp;(PDD), 2011 (version 1.0.11) is available for&nbsp;download.&nbsp;Agents must submit data annually to the Agency by April 10, as planned on Normative Resolution No.&nbsp;395\/2009, which approves the Distribution Procedures (Prodist). The Plan presents the results of planning studies of electric and energy utilities and [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/12991"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12991"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/12991\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12991"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12991"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12991"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}