{"id":12961,"date":"2011-02-18T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-3754","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=12961","title":{"rendered":"Public utility statements for five transmission projects"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=3754&#038;id_area=90'><b>ANEEL<\/b><\/a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<br \/>\nThe Brazilian Electricity Regulatory Agency (ANEEL) has provided public utility statements, for purposes of easement, of approximately 270.6km of tracks of land for transmission projects in the states of Mato Grosso do Sul, Para&iacute;ba, and S&atilde;o Paulo.<br \/>\n&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<br \/>\nThe competence of the Agency to declare the public utility areas of land necessary for the implementation of generation, transmission and distribution projects is provided in Act 9074\/1995, amended by Act 9648\/1998. Normative Resolution 279\/2007 governs the general procedures for application for declaration. See the areas that received the statements (FA\/GL).<\/p>\n<table align='center' border='1' cellpadding='0' cellspacing='1' style='width: 594px' width='594'>\n<tbody>\n<tr>\n<td style='width: 23%'>\n\t\t\t\t<strong>Company<\/strong><\/td>\n<td style='width: 33%'>\n\t\t\t\t<strong>Project<\/strong><\/td>\n<td style='width: 23%'>\n\t\t\t\t<strong>Location<\/strong><\/td>\n<td style='width: 21%'>\n\t\t\t\t<strong>Extent of area declared<\/strong><\/td>\n<\/tr>\n<tr>\n<td style='width: 23%'>\n\t\t\t\tCompanhia Hidro El&eacute;trica do S&atilde;o Francisco (CHESF)<\/td>\n<td style='width: 33%'>\n\t\t\t\tPassage of two transmission line tracks in 138kV, in simple circuits, resulting from the sanctioning of LT 138kV Campina Grande II &ndash; Santa Cruz<\/td>\n<td style='width: 23%'>\n\t\t\t\tMunicipalities of Algod&atilde;o de Janda&iacute;ra, Rem&iacute;gio, Areia, Arara, Serraria, and Pil&otilde;es, in Para&iacute;ba<\/td>\n<td style='width: 21%'>\n\t\t\t\t35km<\/td>\n<\/tr>\n<tr>\n<td style='width: 23%'>\n\t\t\t\tCompanhia de Transmiss&atilde;o de Energia El&eacute;trica Paulista (CTEEP)<\/td>\n<td style='width: 33%'>\n\t\t\t\tSectioning of Transmission Line Botucatu &ndash; Edgard de Souza for connection to Substation Toyota<\/td>\n<td style='width: 23%'>\n\t\t\t\tMunicipality of Sorocaba, in S&atilde;o Paulo<\/td>\n<td style='width: 21%'>\n\t\t\t\t8.5km<\/td>\n<\/tr>\n<tr>\n<td style='width: 23%'>\n\t\t\t\tCompanhia de Transmiss&atilde;o de Energia El&eacute;trica Paulista (CTEEP)<\/td>\n<td style='width: 33%'>\n\t\t\t\tPassage of Transmission Line Valpara&iacute;so &#8211; Nova Avanhandava, interconnecting substation Valpara&iacute;so &#8211; Nova Avanhandava<\/td>\n<td style='width: 23%'>\n\t\t\t\tMunicipalities of Valpara&iacute;so, Bento de Abreu, Rubi&aacute;cea, Guararapes, Ara&ccedil;atuba, Birigui, Coroados, Brejo Alegre, and Buritama, in S&atilde;o Paulo<\/td>\n<td style='width: 21%'>\n\t\t\t\t93km<\/td>\n<\/tr>\n<tr>\n<td style='width: 23%'>\n\t\t\t\tEletrosul Centrais El&eacute;tricas S.A. (Eletrosul)<\/td>\n<td style='width: 33%'>\n\t\t\t\tPassage of transmission line S&atilde;o Domingos &ndash; &Aacute;gua Clara<\/td>\n<td style='width: 23%'>\n\t\t\t\tMunicipality of &Aacute;gua Clara (MS)<\/td>\n<td style='width: 21%'>\n\t\t\t\t53km<\/td>\n<\/tr>\n<tr>\n<td style='width: 23%'>\n\t\t\t\tEnergisa Para&iacute;ba Distribuidora de Energia S.A. (Energisa)<\/td>\n<td style='width: 33%'>\n\t\t\t\tDistribution line Campina Grande II &ndash; Juazeirinho<\/td>\n<td style='width: 23%'>\n\t\t\t\tMunicipalities of Campina Grande, Soledade, Pocinhos, Juazeirinho, in Para&iacute;ba<br \/>\n\t\t\t\t<strong>&#12288;<\/strong><br \/>\n\t\t\t\t&#12288;<\/td>\n<td style='width: 21%'>\n\t\t\t\t81.1km<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div style='clear: both'>\n\t&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Brazilian Electricity Regulatory Agency (ANEEL) has provided public utility statements, for purposes of easement, of approximately 270.6km of tracks of land for transmission projects in the states of Mato Grosso do Sul, Para&iacute;ba, and S&atilde;o Paulo. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The competence of the Agency to declare the public utility areas of land necessary for [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/12961"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12961"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/12961\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12961"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12961"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12961"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}