{"id":12794,"date":"2011-04-01T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-3921","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=12794","title":{"rendered":"Lands located in six states are declared public utility"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=3921&#038;id_area=90'><b>ANEEL<\/b><\/a><br \/>\nTracks of land located in Rio Grande do Sul, Santa Catarina, Paran&aacute;, Goi&aacute;s, Mato Grosso do Sul and S&atilde;o Paulo have been declared public utility by the National Energy Agency (ANEEL) for purposes of expropriation and easements. The areas are necessary for the deployment of generation and transmission projects to be deployed by companies Centrais El&eacute;tricas Brasileiras S.A (Eletrobras), Passos Maia Energ&eacute;tica S.A, Transenergia Goi&aacute;s S.A, Linha de Transmiss&atilde;o do Itatim Ltda e Companhia Leste Paulista de Energia.&nbsp;(PG \/ DB)<\/p>\n<p>See the list of projects:<\/p>\n<table align='center' border='1' cellpadding='0' cellspacing='1'>\n<tbody>\n<tr>\n<td>\n\t\t\t\t<strong>Benefited Company<\/strong><\/td>\n<td>\n\t\t\t\t<strong>Enterprise<\/strong><\/td>\n<td>\n\t\t\t\t<strong>Location<\/strong><\/td>\n<td>\n\t\t\t\t<strong>Extension of enterprise<\/strong><\/td>\n<\/tr>\n<tr>\n<td>\n\t\t\t\tEletrobras<\/td>\n<td>\n\t\t\t\tCandiota substation 500\/230 kV<\/td>\n<td>\n\t\t\t\t<br \/>\n\t\t\t\tCity of Candiota, in the state of Rio Grande do Sul<\/td>\n<td>\n\t\t\t\t2.6293 ha<\/td>\n<\/tr>\n<tr>\n<td style='height: 102px'>\n\t\t\t\tPassos Maia Energ&eacute;tica S.A<\/td>\n<td style='height: 102px'>\n\t\t\t\tTransmission Line SHP Passos Maia &#8211; SE Palmas<\/td>\n<td style='height: 102px'>\n\t\t\t\t<br \/>\n\t\t\t\tCities of Passos Maia and Palmas, in the states of Santa Catarina and Paran&aacute;, respectively.<\/td>\n<td style='height: 102px'>\n\t\t\t\t26 km<\/td>\n<\/tr>\n<tr>\n<td>\n\t\t\t\tTransenergia Goi&aacute;s S.A<\/td>\n<td>\n\t\t\t\tTransmission Line Serra da Mesa &#8211; C2 Niquel&acirc;ndia<\/td>\n<td>\n\t\t\t\tCities of Mina&ccedil;u, Colinas do Sul, Niquel&acirc;ndia, in the state of Goi&aacute;s<\/td>\n<td>\n\t\t\t\t100 km<\/td>\n<\/tr>\n<tr>\n<td>\n\t\t\t\tLinha de Transmiss&atilde;o do Itatim Ltda<\/td>\n<td>\n\t\t\t\tGuatambu Substation &#8211; SHP Figueira<\/td>\n<td>\n\t\t\t\tCity of Cassil&acirc;ndia, in the state of Mato Grosso do Sul<\/td>\n<td>\n\t\t\t\t11 km<\/td>\n<\/tr>\n<tr>\n<td>\n\t\t\t\tCompanhia Leste Paulista de Energia<\/td>\n<td>\n\t\t\t\tDistribution line 138 kVRamal Casa Branca 3<\/td>\n<td>\n\t\t\t\tCity of Casa Branca, in the state of S&atilde;o Paulo<\/td>\n<td>\n\t\t\t\t1,526.50 m<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div style='clear: both'>\n\t&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL Tracks of land located in Rio Grande do Sul, Santa Catarina, Paran&aacute;, Goi&aacute;s, Mato Grosso do Sul and S&atilde;o Paulo have been declared public utility by the National Energy Agency (ANEEL) for purposes of expropriation and easements. The areas are necessary for the deployment of generation and transmission projects to be deployed by [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/12794"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12794"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/12794\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12794"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12794"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12794"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}