{"id":12692,"date":"2011-04-27T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-4023","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=12692","title":{"rendered":"Reinforcements transmission facilities are authorized by ANEEL"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=4023&#038;id_area=90'><b>ANEEL<\/b><\/a><br \/>\nCompany Copel Gera&ccedil;&atilde;o e Transmiss&atilde;o S\/A (Copel GT) was authorized by the National Energy Agency (ANEEL) last April 19 to make reinforcement of their transmission facilities to improve care of the power supply to the Southern region of the country. Reinforcements will be conducted in five substations. To pay for this investment, the company will be entitled to parcels of the Annual Revenue Allowed (RAP)* of BRL 3.45 million.<\/p>\n<p>Check below the reinforcements and the values &#8203;&#8203;of RAP.&nbsp;<\/p>\n<table align='center' border='1' cellpadding='0' cellspacing='1' style='width: 411px' width='411'>\n<tbody>\n<tr>\n<td style='width: 73.5%'>\n\t\t\t\t<strong>Venture<\/strong><\/td>\n<td style='width: 25.82%'>\n\t\t\t\t&nbsp;<br \/>\n\t\t\t\t<strong>Value of the RAP<\/strong><br \/>\n\t\t\t\t&nbsp;<\/td>\n<\/tr>\n<tr>\n<td style='width: 73.5%; height: 34px'>\n\t\t\t\t<strong>SE LONDRINA<\/strong><br \/>\n\t\t\t\tCapacitor banks of 1&#215;30 Mvar-138 and 1&#215;15 Mvar kV &#8211; 138 kV and connections.&nbsp;Extension of the 138kV bus.<\/td>\n<td style='width: 25.82%; height: 34px'>\n\t\t\t\t923,056.05<\/td>\n<\/tr>\n<tr>\n<td style='width: 73.5%; height: 40px'>\n\t\t\t\t<strong>SE MARING&Aacute;<\/strong><br \/>\n\t\t\t\tCapacitor banks of 2&#215;30 Mvar-138 and 1&#215;15 Mvar kV &#8211; 138 kV and connections.&nbsp;Extension of 138 kV bus<\/td>\n<td style='width: 25.82%; height: 40px'>\n\t\t\t\t1,438,186.46<\/td>\n<\/tr>\n<tr>\n<td style='width: 73.5%; height: 46px'>\n\t\t\t\t<strong>SE SARANDI<\/strong><br \/>\n\t\t\t\tCapacitor banks of 1&#215;15 Mvar-138 kV and connection&nbsp;<br \/>\n\t\t\t\tExtension of 138 kV bus<\/td>\n<td style='width: 25.82%; height: 46px'>\n\t\t\t\t407,925.64<\/td>\n<\/tr>\n<tr>\n<td style='width: 73.5%; height: 22px'>\n\t\t\t\t<strong>SE PONTA GROSSA DO NORTE<\/strong><br \/>\n\t\t\t\tCapacitor banks of 1&#215;30 Mvar, 138 kV, connection and extension of 138 kV bus (arranged in a ring).<\/td>\n<td style='width: 25.82%; height: 22px'>\n\t\t\t\t511,234.94<\/td>\n<\/tr>\n<tr>\n<td style='width: 73.5%; height: 22px'>\n\t\t\t\t<strong>SE PILARZINHO<\/strong><br \/>\n\t\t\t\tComplementation of existing capacitor banks of 1&#215;15 Mvar-69 kV-69 kV 1&#215;30 Mvar<\/td>\n<td style='width: 25.82%; height: 22px'>\n\t\t\t\t177,863.60<\/td>\n<\/tr>\n<tr>\n<td style='width: 73.5%; height: 22px'>\n\t\t\t\t<strong>Total<\/strong><\/td>\n<td style='width: 25.82%; height: 22px'>\n\t\t\t\t3,458,266.69<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div style='clear: both'>\n\t&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL Company Copel Gera&ccedil;&atilde;o e Transmiss&atilde;o S\/A (Copel GT) was authorized by the National Energy Agency (ANEEL) last April 19 to make reinforcement of their transmission facilities to improve care of the power supply to the Southern region of the country. Reinforcements will be conducted in five substations. To pay for this investment, the [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/12692"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12692"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/12692\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12692"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12692"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12692"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}