{"id":12535,"date":"2011-06-03T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-4180","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=12535","title":{"rendered":"Authorization for wind power plant in Rio Grande do Sul is transferred by ANEEL"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=4180&#038;id_area=90'><b>ANEEL<\/b><\/a><br \/>\nThe board of the National Agency (ANEEL) transferred the authorization to deploy and Central Geradora E&oacute;lica Santa Vit&oacute;ria do Palmar 1of Elebr&aacute;s Projetos Ltda.&nbsp;to EDP Renov&aacute;veis do Brasil S\/A.&nbsp;<\/p>\n<p>With the decision, which occurred on board meeting last Tuesday (05\/31), EDP Renov&aacute;veis was responsible for deploying the wind power plant in Santa Vitoria do Palmar, in Rio Grande do Sul.&nbsp;<\/p>\n<p>At the same meeting, the board decided to change the power plant from 126 to 81 megawatts (MW) and the name of the generating station to Santa Vit&oacute;ria do Palmar.&nbsp;(DB\/GL)&nbsp;<\/p>\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL The board of the National Agency (ANEEL) transferred the authorization to deploy and Central Geradora E&oacute;lica Santa Vit&oacute;ria do Palmar 1of Elebr&aacute;s Projetos Ltda.&nbsp;to EDP Renov&aacute;veis do Brasil S\/A.&nbsp; With the decision, which occurred on board meeting last Tuesday (05\/31), EDP Renov&aacute;veis was responsible for deploying the wind power plant in Santa Vitoria [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/12535"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12535"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/12535\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12535"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12535"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12535"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}