{"id":12436,"date":"2011-06-29T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-4279","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=12436","title":{"rendered":"Agency keeps rates of Eletropaulo until the methodology review is approved"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=4279&#038;id_area=90'><b>ANEEL<\/b><\/a><br \/>\n<span face=''>The board of the National Energy Agency (ANEEL) decided today (06\/28) to maintain current rates of <\/span>Eletropaulo Metropolitana Eletricidade de S&atilde;o Paulo S\/A until the final publication of the methodology of the third round of rate revisions is published. Eletropaulo serves 6.1 million consumer units in S&atilde;o Paulo and the metropolitan area.<\/p>\n<p><span face=''>The interim procedure for the treatment of rates for electricity distributors that will undergo periodic rate revision this year was approved in April in a public meeting of the board. The model was adopted in the revision of <\/span>Companhia Energ&eacute;tica do Cear&aacute; (Coelce) on April 22.<\/p>\n<p><span face=''>After defining the methodology of the third round of rate revisions, the distributors who had the presence of their rates extended will have 28 days to submit the initial information needed to calculate the rate revision, except those relating to the Regulatory Remuneration Base*, which continue to follow<a href='http:\/\/www.aneel.gov.br\/cedoc\/ren2008342.pdf'> <\/a><\/span><a href='http:\/\/www.aneel.gov.br\/cedoc\/ren2008342.pdf'><strong>Resolution No.<\/strong><\/a><strong><a href='http:\/\/www.aneel.gov.br\/cedoc\/ren2008342.pdf'>342\/2008<\/a><\/strong><a href='http:\/\/www.aneel.gov.br\/cedoc\/ren2008342.pdf'>.<\/a><\/p>\n<p><span face=''>The new resolution will also determine the retroactive application of new contract values <\/span>&#8203;&#8203;at the date of the rate revisions. The change in revenue resulting from the difference between the rates applied in the interim period of validity of the rate review and approval as defined in the final results will be calculated and compensated. (FA\/GL)<\/p>\n<p><span face=''><strong>List of distributors with periodic rate review in 2011<\/strong><\/span><\/p>\n<table border='1' cellpadding='0' cellspacing='1' style='width: 516px' width='516'>\n<tbody>\n<tr>\n<td style='width: 6.92%'>\n\t\t\t\t<span face=''><strong>N<\/strong><\/span><\/td>\n<td style='width: 54.5%'>\n\t\t\t\t<span face=''><strong>DISTRIBUTOR<\/strong><\/span><\/td>\n<td style='width: 20.82%'>\n\t\t\t\t<span face=''><strong>ACRONYM<\/strong><\/span><\/td>\n<td style='width: 16.84%'>\n\t\t\t\t<span face=''><strong>DATE OF REVIEW<\/strong><\/span><\/td>\n<\/tr>\n<tr>\n<td style='width: 6.92%'>\n\t\t\t\t<span face=''>01<\/span><\/td>\n<td style='width: 54.5%'>\n\t\t\t\t<span face=''>Companhia<\/span>Energ&eacute;tica do Cear&aacute;<\/td>\n<td style='width: 20.82%'>\n\t\t\t\t<span face=''>COELCE<\/span><\/td>\n<td style='width: 16.84%'>\n\t\t\t\t<span face=''>04\/22<\/span><\/td>\n<\/tr>\n<tr>\n<td style='width: 6.92%'>\n\t\t\t\t<span face=''>02<\/span><\/td>\n<td style='width: 54.5%'>\n\t\t\t\t<span face=''>Eletropaulo<\/span>Metropolitana Eletricidade de S&atilde;o Paulo S\/A<\/td>\n<td style='width: 20.82%'>\n\t\t\t\t<span face=''>ELETROPAULO<\/span><\/td>\n<td style='width: 16.84%'>\n\t\t\t\t<span face=''>07\/04<\/span><\/td>\n<\/tr>\n<tr>\n<td style='width: 6.92%'>\n\t\t\t\t<span face=''>03<\/span><\/td>\n<td style='width: 54.5%'>\n\t\t\t\t<span face=''>Centrais El&eacute;tricas<\/span>do Par&aacute; S\/A<\/td>\n<td style='width: 20.82%'>\n\t\t\t\t<span face=''>CELPA<\/span><\/td>\n<td style='width: 16.84%'>\n\t\t\t\t<span face=''>08\/07<\/span><\/td>\n<\/tr>\n<tr>\n<td style='width: 6.92%'>\n\t\t\t\t<span face=''>04<\/span><\/td>\n<td style='width: 54.5%'>\n\t\t\t\t<span face=''>Elektro<\/span>Eletricidade e Servi&ccedil;os S\/A<\/td>\n<td style='width: 20.82%'>\n\t\t\t\t<span face=''>ELEKTRO<\/span><\/td>\n<td style='width: 16.84%'>\n\t\t\t\t<span face=''>08\/27<\/span><\/td>\n<\/tr>\n<tr>\n<td style='width: 6.92%'>\n\t\t\t\t<span face=''>05<\/span><\/td>\n<td style='width: 54.5%'>\n\t\t\t\t<span face=''>Bandeirante Energia<\/span>S\/A<\/td>\n<td style='width: 20.82%'>\n\t\t\t\t<span face=''>BANDEIRANTE<\/span><\/td>\n<td style='width: 16.84%'>\n\t\t\t\t<span face=''>10\/23<\/span><\/td>\n<\/tr>\n<tr>\n<td style='width: 6.92%'>\n\t\t\t\t<span face=''>06<\/span><\/td>\n<td style='width: 54.5%'>\n\t\t\t\t<span face=''>Companhia<\/span>Piratininga de For&ccedil;a e Luz<\/td>\n<td style='width: 20.82%'>\n\t\t\t\t<span face=''>CPFL -PIRATININGA<\/span><\/td>\n<td style='width: 16.84%'>\n\t\t\t\t<span face=''>10\/23<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span face=''><strong>*Remuneration Base &#8211;<\/strong><\/span>&nbsp;prudent investment required by the concessionaire to provide the public service delivery in accordance with the conditions established in the concession contract, in particular the quality levels, valued at market prices and adjusted through the use of indexes.&nbsp;<a href='http:\/\/www.aneel.gov.br\/cedoc\/ren2006234.pdf'><em><u><strong><span face=''>ANEEL Resolution No 234 of October 31, 2006 (Official Gazette of November 8, 2006, section 1, p. 111) <\/span><\/strong><\/u><\/em><\/a><\/p>\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL The board of the National Energy Agency (ANEEL) decided today (06\/28) to maintain current rates of Eletropaulo Metropolitana Eletricidade de S&atilde;o Paulo S\/A until the final publication of the methodology of the third round of rate revisions is published. Eletropaulo serves 6.1 million consumer units in S&atilde;o Paulo and the metropolitan area. The [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/12436"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12436"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/12436\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12436"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12436"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12436"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}