{"id":12407,"date":"2011-07-06T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-4308","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=12407","title":{"rendered":"Fine given to the ONS closes proceedings on the 2009 blackout"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=4308&#038;id_area=90'><b>ANEEL<\/b><\/a>&nbsp;<\/p>\n<p>With the continuation of the fine to the National System Operator (ONS), the National Energy Agency (ANEEL) closed on Tuesday (07\/05) punitive processes related to the blackout occurred at 10:13PM on November 10, 2009 when there was interruption of 24,436 Megawatts (MW) of electrical system in the South and Southeast regions and reached 18 states.<\/p>\n<p>The ONS was fined at BRL 1.1 million by faulty operation that caused the delay in rebuilding the system. The penalty imposed by the technical area was BRL 1.3 million, a figure reduced by BRL 200 thousand by the board during the public meeting this Tuesday (07\/05).<\/p>\n<p>Another six agents were punished for their roles in the incident. The total fines amounted to BRL 47.6 million.&nbsp;Check&nbsp;<a href='http:\/\/www.aneel.gov.br\/aplicacoes\/leitura_arquivo\/default.cfm?idAplicacao=221'><strong>reports.<\/strong><\/a>&nbsp;(FA\/GL)<\/p>\n<p><strong>Below is summary of the agents involved and their penalties<\/strong>&nbsp;&nbsp;<\/p>\n<table border='1' cellpadding='0' cellspacing='1' style='width: 588px' width='588'>\n<tbody>\n<tr>\n<td style='width: 26.78%'>\n\t\t\t\t<strong>AGENT<\/strong><\/td>\n<td style='width: 25.8%'>\n\t\t\t\t<strong>INFRINGEMENT<\/strong><\/td>\n<td style='width: 25.8%'>\n\t\t\t\t<strong>PENALTY<\/strong><\/td>\n<td style='width: 20.84%'>\n\t\t\t\t<strong>SITUATION<\/strong><\/td>\n<\/tr>\n<tr>\n<td style='width: 26.78%'>\n\t\t\t\t<strong>FURNAS CENTRAIS EL&Eacute;TRICAS<\/strong><\/td>\n<td style='width: 25.8%'>\n\t\t\t\t<strong>Responsible for the shutdown. It was cited for failure in the operation and maintenance of equipment<\/strong><\/td>\n<td style='width: 25.8%'>\n\t\t\t\t<br \/>\n\t\t\t\t<strong>Fine of BRL 43 million<\/strong><\/td>\n<td style='width: 20.84%'>\n\t\t\t\t<strong>Judicial<\/strong><\/td>\n<\/tr>\n<tr>\n<td style='width: 26.78%'>\n\t\t\t\t<strong>COMPANHIA DE TRANSMISS&Atilde;O DE ENERGIA EL&Eacute;TRICA PAULISTA &ndash; CTEEP<\/strong><\/td>\n<td style='width: 25.8%'>\n\t\t\t\t<strong>Failures during the rebuilding of the concessionaire&#39;s transmission system<\/strong><\/td>\n<td style='width: 25.8%'>\n\t\t\t\t<strong>Fine of BRL 3.1 million<\/strong><\/td>\n<td style='width: 20.84%'>\n\t\t\t\t<strong>Judicial<\/strong><\/td>\n<\/tr>\n<tr>\n<td style='width: 26.78%'>\n\t\t\t\t<strong>OPERADOR NACIONAL DO SISTEMA &ndash; ONS<\/strong><\/td>\n<td style='width: 25.8%'>\n\t\t\t\t<strong>Failure in the operation intensified delay in rebuilding the system<\/strong><\/td>\n<td style='width: 25.8%'>\n\t\t\t\t<strong>Fine of BRL 1.1 million<\/strong><\/td>\n<td style='width: 20.84%'>\n\t\t\t\t<strong>10 days to pay after the publication of the order<\/strong><\/td>\n<\/tr>\n<tr>\n<td style='width: 26.78%'>\n\t\t\t\t<strong>Ribeir&atilde;o Preto Transmissora de Energia S\/A &#8211; (RPTE)<\/strong><\/td>\n<td style='width: 25.8%'>\n\t\t\t\t<strong>Failure in the rebuilding of the transmission system<\/strong><\/td>\n<td style='width: 25.8%'>\n\t\t\t\t<strong>Fine of BRL 30,700<\/strong><\/td>\n<td style='width: 20.84%'>\n\t\t\t\t<strong>Registration at the unsettled Credit Reporting Register of the Federal Public Sector &#8211; CADIN<\/strong><\/td>\n<\/tr>\n<tr>\n<td style='width: 26.78%'>\n\t\t\t\t<strong>Po&ccedil;os de Caldas Transmissora de Energia Ltda &#8211; (PCTE)<\/strong><\/td>\n<td style='width: 25.8%'>\n\t\t\t\t<strong>Failure in the rebuilding of the transmission system<\/strong><\/td>\n<td style='width: 25.8%'>\n\t\t\t\t<strong>Fine of BRL 38,900<\/strong><\/td>\n<td style='width: 20.84%'>\n\t\t\t\t<strong>Fine paid<\/strong><\/td>\n<\/tr>\n<tr>\n<td style='width: 26.78%'>\n\t\t\t\t<strong>LT Tri&acirc;ngulo S\/A<\/strong><\/td>\n<td style='width: 25.8%'>\n\t\t\t\t<strong>Failure in the rebuilding of the transmission system<\/strong><\/td>\n<td style='width: 25.8%'>\n\t\t\t\t<strong>Fine of BRL 95,600<\/strong><\/td>\n<td style='width: 20.84%'>\n\t\t\t\t<strong>Fine paid<\/strong><\/td>\n<\/tr>\n<tr>\n<td style='width: 26.78%'>\n\t\t\t\t<strong>Expansion Transmiss&atilde;o Itumbiara Marimbondo S\/A &#8211; ETIM<\/strong><\/td>\n<td style='width: 25.8%'>\n\t\t\t\t<strong>Failure in the rebuilding of the transmission system<\/strong><\/td>\n<td style='width: 25.8%'>\n\t\t\t\t<strong>Fine of BRL 65,300<\/strong><\/td>\n<td style='width: 20.84%'>\n\t\t\t\t<strong>Fine paid<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL&nbsp; With the continuation of the fine to the National System Operator (ONS), the National Energy Agency (ANEEL) closed on Tuesday (07\/05) punitive processes related to the blackout occurred at 10:13PM on November 10, 2009 when there was interruption of 24,436 Megawatts (MW) of electrical system in the South and Southeast regions and reached [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/12407"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12407"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/12407\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12407"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12407"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12407"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}