{"id":11764,"date":"2011-11-30T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-4951","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=11764","title":{"rendered":"Inventory studies on the Canoas and Piu\u00ed Rivers are approved"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=4951&#038;id_area=90'><b>ANEEL<\/b><\/a><\/p>\n<p>The Brazilian Electricity Regulatory Agency (ANEEL) approved the review of the hydroelectric inventory studies of the Canoas River, in Santa Catarina, and the hydroelectric inventory studies of the Piu&iacute; River, in Minas Gerais. The Superintendence of Hydroenergetic Management and Studies (SGH) published the result of the two analyses, respectively, in Dispatches no. <a href='http:\/\/www.in.gov.br\/imprensa\/visualiza\/index.jsp?jornal=1&amp;pagina=77&amp;data=28\/11\/2011' target='_blank'>4.521<\/a>&nbsp;and no. <a href='http:\/\/www.in.gov.br\/visualiza\/index.jsp?data=28\/11\/2011&amp;jornal=1&amp;pagina=78&amp;totalArquivos=128' target='_blank'>4.533<\/a>, in the Official Federal Gazette this Monday (11\/28).<\/p>\n<p>Two utilizations were identified on Canoas River, between its fountainhead and the S&atilde;o Roque Hydroelectric Plant reservoir, totaling approximately 49.3 megawatts (MW) of installed power.<\/p>\n<p>On the Piu&iacute; River, located in the Paran&aacute; River water basin, a utilization was identified with 7.17 MW of installed power.<\/p>\n<p>With the approval of these studies, the hydroelectric utilizations identified therein are now part of the portfolio of available plants for the elaboration of feasibility studies and basic projects.<\/p>\n<p>The inventory studies approved by ANEEL, as well as the list of studies that are under analysis, can be consulted on the Agency&rsquo;s website at <a href='http:\/\/www.aneel.gov.br\/biblioteca\/inventario.cfm' target='_blank'>Hydroelectric Inventories<\/a>and <a href='http:\/\/www.aneel.gov.br\/area.cfm?idArea=428&amp;idPerfil=2' target='_blank'>Follow-up on Studies and Projects<\/a>.(BT).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL The Brazilian Electricity Regulatory Agency (ANEEL) approved the review of the hydroelectric inventory studies of the Canoas River, in Santa Catarina, and the hydroelectric inventory studies of the Piu&iacute; River, in Minas Gerais. The Superintendence of Hydroenergetic Management and Studies (SGH) published the result of the two analyses, respectively, in Dispatches no. 4.521&nbsp;and [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/11764"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11764"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/11764\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11764"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11764"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11764"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}