{"id":11756,"date":"2011-12-01T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-4959","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=11756","title":{"rendered":"S\u00e3o Roque power plant has feasibility study approved"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=4959&#038;id_area=90'><b>ANEEL<\/b><\/a><\/p>\n<p>The National Energy Agency (ANEEL) approved the feasibility study of Hydroelectric Power Plant (HPP) S&atilde;o Roque, planned to be built on the Canoas river, in Santa Catarina. The Superintendent of Hydroenergetic Management and Research (SGH) has published the decision in&nbsp;<a href='http:\/\/www.in.gov.br\/imprensa\/visualiza\/index.jsp?jornal=1&amp;pagina=143&amp;data=30\/11\/2011' target='_blank'>Order No. 4564<\/a>&nbsp;in the Official Journal on Wednesday (11\/30).<\/p>\n<p>The plant is expected to have an installed capacity of 135 megawatts (MW), with a physical guarantee of 90.9 average megawatts (MWmed).&nbsp;It stands out because its reservoir holds points up to 14 feet deep &#8211; feature rarely viable in power plants today.&nbsp;The area flooded by the reservoir is 45.9 km<sup>2<\/sup>, giving a ratio of flooded area\/installed capacity of 0.34 km&sup2;\/MW.<\/p>\n<p>With the approval of the studies, this energy can be sold in the next new energy auction, scheduled for completion on 12\/20.&nbsp;The start of commercial operation of the first generating unit is scheduled for 01\/01\/2016. (BT\/DB).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL The National Energy Agency (ANEEL) approved the feasibility study of Hydroelectric Power Plant (HPP) S&atilde;o Roque, planned to be built on the Canoas river, in Santa Catarina. The Superintendent of Hydroenergetic Management and Research (SGH) has published the decision in&nbsp;Order No. 4564&nbsp;in the Official Journal on Wednesday (11\/30). The plant is expected to [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/11756"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11756"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/11756\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11756"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11756"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11756"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}