{"id":11735,"date":"2011-12-08T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-4980","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=11735","title":{"rendered":"Public hearing on Tariff Regulation Procedures approved"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=4980&#038;id_area=90'><b>ANEEL<\/b><\/a><\/p>\n<p>The board of the Brazilian Electricity Regulatory Agency (ANEEL) has approved the public hearing for obtaining subsides on sub-modules 9.3, 9.4, 9.5, 9.6 and 10.5 of the Tariff Regulation Procedures (PRORET). The decision took place in a college meeting held last Tuesday (12\/6).<\/p>\n<p>The period for submission of contributions to the hearing, started today (12\/8), will last until 2\/10\/2012. The table below shows the subjects of the sub-modules submitted to public hearing.<\/p>\n<table align='center' border='5' cellpadding='0' cellspacing='0' style='width: 409px; height: 157px' width='409'>\n<tbody>\n<tr>\n<td style='border-bottom-color: #666666; text-align: center; border-top-color: #666666; border-right-color: #666666; border-left-color: #666666'>\n\t\t\t\t<strong>No.<\/strong><\/td>\n<td style='border-bottom-color: #666666; text-align: center; border-top-color: #666666; border-right-color: #666666; border-left-color: #666666'>\n\t\t\t\t<strong>Title<\/strong><\/td>\n<\/tr>\n<tr>\n<td style='border-bottom-color: #666666; text-align: center; border-top-color: #666666; border-right-color: #666666; border-left-color: #666666'>\n\t\t\t\t9.3<\/td>\n<td style='border-bottom-color: #666666; border-top-color: #666666; border-right-color: #666666; border-left-color: #666666'>\n\t\t\t\tAnnual Readjustment of Revenues of Facilities under the&nbsp; Responsibility of Transmission Concessionaires<\/td>\n<\/tr>\n<tr>\n<td style='border-bottom-color: #666666; text-align: center; border-top-color: #666666; border-right-color: #666666; border-left-color: #666666'>\n\t\t\t\t9.4<\/td>\n<td style='border-bottom-color: #666666; border-top-color: #666666; border-right-color: #666666; border-left-color: #666666'>\n\t\t\t\tCalculation of Transmission System Use Tariffs (TUST) and the Itaipu Transportation Tariff<\/td>\n<\/tr>\n<tr>\n<td style='border-bottom-color: #666666; text-align: center; border-top-color: #666666; border-right-color: #666666; border-left-color: #666666'>\n\t\t\t\t9.5<\/td>\n<td style='border-bottom-color: #666666; border-top-color: #666666; border-right-color: #666666; border-left-color: #666666'>\n\t\t\t\tEstablishment of the TUST for Transmission System Users<\/td>\n<\/tr>\n<tr>\n<td style='border-bottom-color: #666666; text-align: center; border-top-color: #666666; border-right-color: #666666; border-left-color: #666666'>\n\t\t\t\t9.6<\/td>\n<td style='border-bottom-color: #666666; border-top-color: #666666; border-right-color: #666666; border-left-color: #666666'>\n\t\t\t\tCalculation of Use and Connection Charges for the Distributors&rsquo; Tariff Readjustment or Revision<\/td>\n<\/tr>\n<tr>\n<td style='border-bottom-color: #666666; text-align: center; border-top-color: #666666; border-right-color: #666666; border-left-color: #666666'>\n\t\t\t\t10.5<\/td>\n<td style='border-bottom-color: #666666; border-top-color: #666666; border-right-color: #666666; border-left-color: #666666'>\n\t\t\t\tPeriodic Information for TUST and Charge Calculation<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div style='clear: both'>\n\t&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL The board of the Brazilian Electricity Regulatory Agency (ANEEL) has approved the public hearing for obtaining subsides on sub-modules 9.3, 9.4, 9.5, 9.6 and 10.5 of the Tariff Regulation Procedures (PRORET). The decision took place in a college meeting held last Tuesday (12\/6). The period for submission of contributions to the hearing, started [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/11735"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11735"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/11735\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11735"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11735"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11735"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}