{"id":11685,"date":"2011-12-15T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-5030","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=11685","title":{"rendered":"Feasibility studies of Usina Hidrel\u00e9trica Castelhano are approved"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=5030&#038;id_area=90'><b>ANEEL<\/b><\/a><\/p>\n<div>\n\tThe National Energy Agency (ANEEL) approved the feasibility studies of <strong>Usina Hidrel&eacute;trica Castelhano<\/strong>, planned to be built in Rio Parna&iacute;ba in the states of Piau&iacute; and Maranh&atilde;o. The approval from the Agency was published in the Official Journal on Tuesday (12\/13), through <a href='http:\/\/www.in.gov.br\/imprensa\/visualiza\/index.jsp%3Fjornal%3D1%26pagina%3D86%26data%3D13\/12\/2011' target='_blank'>Order No. 4771<\/a>. With the approval of the studies, their energy can be sold in the next A-5 auction, scheduled for 12\/20. The start of commercial operation of the first generating unit is scheduled for 01\/01\/2016.<\/p>\n<p>\tThe plant, whose feasibility studies have been presented by Companhia Hidrel&eacute;trica do S&atilde;o Francisco (CHESF), will have an installed capacity of 64 megawatts (MW), with a physical guarantee of 46.2 average megawatts (MWmed).<\/p>\n<p>\tAlso on Tuesday, were published in the Official Journal <a href='http:\/\/www.in.gov.br\/visualiza\/index.jsp%3Fdata%3D13\/12\/2011%26jornal%3D1%26pagina%3D87%26totalArquivos%3D232' target='_blank'>Orders No. 4775, 4776, 4777 and 4781<\/a>, which decided to return in the analysis stage, respectively, the hydroelectric inventory studies of C&oacute;rrego do Lajeado, the review of studies on hydroelectric inventory of Rio Piolhinho and Ribeir&atilde;o &Aacute;gua Verde and hydropower inventory studies of Rio Le&atilde;o. All of them were returned by the lack of technical content suitable for the characterization of the hydroelectric potential of the basins studied. (HP\/BT).<\/p>\n<p>\t&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL The National Energy Agency (ANEEL) approved the feasibility studies of Usina Hidrel&eacute;trica Castelhano, planned to be built in Rio Parna&iacute;ba in the states of Piau&iacute; and Maranh&atilde;o. The approval from the Agency was published in the Official Journal on Tuesday (12\/13), through Order No. 4771. With the approval of the studies, their energy [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/11685"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11685"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/11685\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11685"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11685"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11685"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}