{"id":11682,"date":"2011-12-15T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-5033","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=11682","title":{"rendered":"Changing the base date of Empresa For\u00e7a e Luz Jo\u00e3o Cesa is the subject of a vhearing"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=5033&#038;id_area=90'><b>ANEEL<\/b><\/a><\/p>\n<p>The National Energy Agency (ANEEL) opens today (12\/15) public hearing to assess the possible change of date for rate revision and annual adjustment of Empresa For&ccedil;a e Luz Jo&atilde;o Cesa Ltda (EFLJC). The audience, through the exchange of documents, was approved by the board of the Agency at the public meeting on Tuesday (12\/13) and will receive contributions until 12\/30.<\/p>\n<p>The EFLJC, whose next rate anniversary is on 03\/30\/2012, asked the Agency to extend that deadline until 08\/14\/2012 in order to concatenate its rate revision to that of Centrais El&eacute;tricas de Santa Catarina S\/A (Celesc), its supplier, with a review scheduled for 08\/07\/2012.<\/p>\n<p>The Economic Regulation Superintendency (SRE), responsible for examining the petition, has recommended the extension of the validity of the rates now charged by EFLJCL. Thus, on 08\/14\/2012, its Third Periodic Rate Revision would be processed, with feedback of economic effects and financial resources to the original contract anniversary date &ndash; 03\/30\/2012.<\/p>\n<p>Those interested in contributing can send proposals to the e-mail address <a href='mailto:ap074_2011@aneel.gov.br'>ap074_2011@aneel.gov.br<\/a>. Contributions can also be sent by fax (55 61) 2192-8839 or to the address of the Agency (SGAN, Quadra 603, M&oacute;dulo I, T&eacute;rreo, Protocolo Geral, CEP: 70.830-030), em Bras&iacute;lia (DF). (BT\/DB).<\/p>\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL The National Energy Agency (ANEEL) opens today (12\/15) public hearing to assess the possible change of date for rate revision and annual adjustment of Empresa For&ccedil;a e Luz Jo&atilde;o Cesa Ltda (EFLJC). The audience, through the exchange of documents, was approved by the board of the Agency at the public meeting on Tuesday [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/11682"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11682"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/11682\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11682"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11682"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11682"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}