{"id":11660,"date":"2011-12-16T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-5055","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=11660","title":{"rendered":"Marumbi Consortium takes lot F"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=5055&#038;id_area=90'><b>ANEEL<\/b><\/a><\/p>\n<p>The Marumbi Consortium eon Lot F of Transmission Auction no.006\/2011, held by the Brazilian Electricity Regulatory Agency (ANEEL) this Friday (12\/16), with a bid worth R$ 12,972,000.00. The consortium is comprised of Copel Gera&ccedil;&atilde;o e Transmiss&atilde;o S.A (80%) and Eletrosul Centrais El&eacute;tricas S.A (20%).<\/p>\n<p>Lot F is comprised of the Curitiba-Curitiba East transmission line and the Curitiba East substation in Paran&aacute;.The undertaking&rsquo;s objective is to reinforce Curitiba&rsquo;s power supply to meet growing consumption and as a result of events like the World Cup.Works should take 24 months with the projected creation of 528 direct jobs.<\/p>\n<p>For more details see <a href='http:\/\/www.aneel.gov.br\/arquivos\/PDF\/lt-006-2011-lote-F.pdf' target='_blank'>Lot F<\/a>&nbsp;and <a href='http:\/\/www.aneel.gov.br\/arquivos\/PDF\/detalhamento-dos-lotes-com-descricao-lt-006-2011.pdf' target='_blank'>other lots<\/a>&nbsp;of Auction no.006\/2011. Follow auction results at CLIC Energia, per lot.(BT\/FA).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL The Marumbi Consortium eon Lot F of Transmission Auction no.006\/2011, held by the Brazilian Electricity Regulatory Agency (ANEEL) this Friday (12\/16), with a bid worth R$ 12,972,000.00. The consortium is comprised of Copel Gera&ccedil;&atilde;o e Transmiss&atilde;o S.A (80%) and Eletrosul Centrais El&eacute;tricas S.A (20%). Lot F is comprised of the Curitiba-Curitiba East transmission [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/11660"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11660"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/11660\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11660"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11660"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11660"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}