{"id":11658,"date":"2011-12-16T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-5057","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=11658","title":{"rendered":"Luzi\u00e2nia-Niquel\u00e2ndia Consortium takes Lot H"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=5057&#038;id_area=90'><b>ANEEL<\/b><\/a><\/p>\n<p>Lot H of Transmission Auction no.006\/2011, held by the Brazilian Electricity Regulatory Agency (ANEEL) his Friday (12\/16) was won by the Luzi&acirc;nia-Niquel&acirc;ndia Consortium, comprised of State Grid do Brazil Holding S.A.(51%) and Furnas Centrais El&eacute;tricas S.A.(49%). The company was the only tenderer with a bid worth R$ 7,447,440.60, at a discount of 5.20% compared to the Permitted Annual Revenue (PAR) initially stipulated by the Agency.PAR is the revenue to which a company has the right for providing transmission service after the start of commercial operations at the installations.<\/p>\n<p>Lot H is comprised of the Luzi&acirc;nia and Niquel&acirc;ndia substations in Goi&aacute;s.Construction should be concluded in 20 months after signing the concession contract, and it will create a projected 391 direct jobs.The line will try to meet the growing demand for electric energy and increase supply reliability in the regions of Niquel&acirc;ndia and Luzi&acirc;nia.<\/p>\n<p>For more details see <a href='http:\/\/www.aneel.gov.br\/arquivos\/PDF\/lt-006-2011-lote-H.pdf' target='_blank'>Lot H<\/a>&nbsp;and <a href='http:\/\/www.aneel.gov.br\/arquivos\/PDF\/detalhamento-dos-lotes-com-descricao-lt-006-2011.pdf' target='_blank'>other lots<\/a>&nbsp;of Auction no.006\/2011. Follow auction results at CLIC Energia, per lot.(BT\/FA).<\/p>\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL Lot H of Transmission Auction no.006\/2011, held by the Brazilian Electricity Regulatory Agency (ANEEL) his Friday (12\/16) was won by the Luzi&acirc;nia-Niquel&acirc;ndia Consortium, comprised of State Grid do Brazil Holding S.A.(51%) and Furnas Centrais El&eacute;tricas S.A.(49%). The company was the only tenderer with a bid worth R$ 7,447,440.60, at a discount of 5.20% [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/11658"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11658"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/11658\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11658"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11658"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11658"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}