{"id":11609,"date":"2012-01-12T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-5106","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=11609","title":{"rendered":"ANEEL signs transmission auction concession agreement"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=5106&#038;id_area=90'><b>ANEEL<\/b><\/a><\/p>\n<p>The concession agreement of Lot E of transmission auction 004\/2011, held in September last year, was signed today (1\/12) at the headquarters of the Brazilian Electricity Regulatory Agency (ANEEL), by the Agency&rsquo;s Director-General, Nelson H&uuml;bner and representatives of Cons&oacute;rcio Costa Oeste (comprising Copel Gera&ccedil;&atilde;o e Transmiss&atilde;o S.A. &ndash; 51% &ndash; and Eletrosul Centrais El&eacute;tricas S.A. &ndash; 49%). Lot E contains the transmission line Cascavel-Umuarama, with 143 km in length, and substation Umuarama. These projects aim to strengthen power supply to the Northwest Region of Paran&aacute;.<\/p>\n<p>On December 9 last year, agreements were signed for most of the lots in this contest, except Lots A, E, and F. <a href='http:\/\/www.aneel.gov.br\/aplicacoes\/editais_transmissao\/documentos\/RESULTADO_do_LEILAO%2004_2011.pdf' target='_blank'><strong>Click here<\/strong><\/a>&nbsp;to check the detailed results of the auction. The 12 auctioned lots comprise 2,051 kilometers (km) of transmission lines and 12 substations with 6,900 megavolt-amperes (MVA) of power. The projects are located in the states of Roraima, Par&aacute;, Mato Grosso, Goi&aacute;s, Paran&aacute;, Minas Gerais, Piau&iacute;, Pernambuco, Bahia, Rio de Janeiro, S&atilde;o Paulo, Alagoas, and Para&iacute;ba. The new facilities will require investments of approximately R$2.8 billion, generating 11,600 direct jobs. The period of completion for the works is 18 to 36 months and the concession agreements will be valid for 30 years. (DB\/PG).<\/p>\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL The concession agreement of Lot E of transmission auction 004\/2011, held in September last year, was signed today (1\/12) at the headquarters of the Brazilian Electricity Regulatory Agency (ANEEL), by the Agency&rsquo;s Director-General, Nelson H&uuml;bner and representatives of Cons&oacute;rcio Costa Oeste (comprising Copel Gera&ccedil;&atilde;o e Transmiss&atilde;o S.A. &ndash; 51% &ndash; and Eletrosul Centrais [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/11609"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11609"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/11609\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11609"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11609"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11609"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}