{"id":10853,"date":"2012-07-24T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-5862","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=10853","title":{"rendered":"Public hearing proposes rate revision for CEEE-D (RS)"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=5862&#038;id_area=90'><b>ANEEL<\/b><\/a>The board of the National Agency of Electrical Energy (ANEEL) approved today (07\/24) the initial proposal for the third Periodic Rate Revision (TPR) of Companhia Estadual de Distribui&ccedil;&atilde;o de Energia El&eacute;trica (CEEE-D), which will undergo public hearing from 07\/26 to 08\/31. Check below the average preliminary approval for the company:<br \/>\n&nbsp;<\/p>\n<table align='center' border='1' cellpadding='0' cellspacing='1' style='width: 458px' width='458'>\n<tbody>\n<tr>\n<td style='width: 24.74%; height: 48px'>\n\t\t\t\t<strong>Company<\/strong><\/td>\n<td style='width: 16.84%; height: 48px'>\n\t\t\t\t<strong>Primary medium effect<\/strong><\/td>\n<td style='width: 23.76%; height: 48px'>\n\t\t\t\t<strong>No. of consumer<\/strong><strong>units<\/strong><\/p>\n<p>\t\t\t\t&nbsp;<\/td>\n<td style='width: 33.64%; height: 48px'>\n\t\t\t\t<strong>Area served<\/strong><\/td>\n<\/tr>\n<tr>\n<td style='width: 24.74%; height: 51px'>\n\t\t\t\tCEEE-D (RS)<\/td>\n<td style='width: 16.84%; height: 51px'>\n\t\t\t\t<strong>2.61%<\/strong><\/td>\n<td style='width: 23.76%; height: 51px'>\n\t\t\t\t1.4 million<\/td>\n<td style='width: 33.64%; height: 51px'>\n\t\t\t\t72 municipalities in the south-southeast of Rio Grande do Sul<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div style='clear: both'>\n\t&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEELThe board of the National Agency of Electrical Energy (ANEEL) approved today (07\/24) the initial proposal for the third Periodic Rate Revision (TPR) of Companhia Estadual de Distribui&ccedil;&atilde;o de Energia El&eacute;trica (CEEE-D), which will undergo public hearing from 07\/26 to 08\/31. Check below the average preliminary approval for the company: &nbsp; Company Primary medium [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/10853"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10853"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/10853\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10853"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10853"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10853"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}