{"id":10205,"date":"2013-02-25T12:00:00","date_gmt":"2015-03-22T16:00:00","guid":{"rendered":""},"modified":"-0001-11-30T00:00:00","modified_gmt":"-0001-11-30T04:00:00","slug":"ANEEL-6510","status":"publish","type":"post","link":"http:\/\/sindenergia.com.br\/seminario\/?p=10205","title":{"rendered":"Contratos de concess\u00e3o do Leil\u00e3o de Transmiss\u00e3o N\u00ba 07\/2012 s\u00e3o assinados"},"content":{"rendered":"<p><b>Fonte: <\/b><a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=6510&#038;id_area=90'><b>ANEEL<\/b><\/a><\/p>\n<p style='text-align: justify'>\n\t<span  14px'><img alt='Assinatura de Contratos' src='http:\/\/www.aneel.gov.br\/arquivos\/gif\/_moacir_foto.JPG' style='border-bottom: 0px solid; border-left: 0px solid; margin: 10px; width: 380px; float: left; height: 225px; border-top: 0px solid; border-right: 0px solid' \/>&nbsp;&nbsp; A assinatura de cinco contratos de concess&atilde;o do Leil&atilde;o de Transmiss&atilde;o n<sup>o<\/sup> 07\/2012 foi realizada hoje (25\/02) na sede da Ag&ecirc;ncia Nacional de Energia El&eacute;trica (ANEEL) e contou com a presen&ccedil;a do Diretor-Geral da Ag&ecirc;ncia, Nelson Hubner, e de representantes dos cons&oacute;rcios vencedores. Os outros dois contratos referentes aos lotes D e G s&oacute; ser&atilde;o assinados ap&oacute;s a complementa&ccedil;&atilde;o da documenta&ccedil;&atilde;o.<\/span><\/p>\n<p style='text-align: justify'>\n\t<span  14px'>&nbsp;&nbsp; Realizado em 21\/12\/12 na sede da BM&amp;FBOVESPA, em S&atilde;o Paulo, o leil&atilde;o terminou com 21,7% de des&aacute;gio. Ao todo, foram ofertados oito lotes, sendo que um deles, o lote H, n&atilde;o teve interessados e deve entrar nos pr&oacute;ximos leil&otilde;es a serem realizados pela Ag&ecirc;ncia. Foram licitadas 15 linhas de transmiss&atilde;o e oito subesta&ccedil;&otilde;es, nos estados de Tocantins, Goi&aacute;s, Acre, Piau&iacute;, Maranh&atilde;o, Bahia, Cear&aacute;, Para&iacute;ba, Rio Grande do Norte, Minas Gerais e S&atilde;o Paulo. A Receita Anual Permitida de refer&ecirc;ncia (RAP)* m&aacute;xima a ser paga aos empreendedores, determinada no edital, &eacute; de R$ 476,1 milh&otilde;es, j&aacute; considerando a extin&ccedil;&atilde;o da Reserva Global de Revers&atilde;o (RGR) a partir de 2013, conforme determina a Medida Provis&oacute;ria N&ordm; 579\/2012. Confira aqui mais informa&ccedil;&otilde;es sobre o <a href='http:\/\/www.aneel.gov.br\/aplicacoes\/noticias\/Output_Noticias.cfm?Identidade=6337&amp;id_area=90'>resultado<\/a>&nbsp;do leil&atilde;o.<\/span><br \/>\n\t&nbsp;<\/p>\n<p style='text-align: justify'>\n\t<span  14px'>&nbsp;&nbsp; Durante a cerim&ocirc;nia de assinatura, o Diretor-Geral, Nelson Hubner, destacou que o Leil&atilde;o n&ordm; 07\/202, o primeiro realizado ap&oacute;s a edi&ccedil;&atilde;o da Medida Provis&oacute;ria N&ordm; 579\/2012 que trata da redu&ccedil;&atilde;o tarif&aacute;ria, contou com investidores fortes, contrariando a ideia de que n&atilde;o haveria interesse no certame devido &agrave;s condi&ccedil;&otilde;es impostas na MP. &ldquo;Esse leil&atilde;o teve lotes grandes e importantes no Nordeste, al&eacute;m de uma forte competi&ccedil;&atilde;o de grupos como a Abengoa e Copel. Ficou comprovado que o interesse no setor continua apesar das especula&ccedil;&otilde;es em rela&ccedil;&atilde;o &agrave; MP N&ordm; 579\/2012&rdquo;, ressaltou.<\/span><\/p>\n<p style='text-align: justify'>\n\t<span  14px'>&nbsp;&nbsp; O prazo de conclus&atilde;o das obras ser&aacute; de 22 a 36 meses e os contratos de concess&atilde;o s&atilde;o de 30 anos.Veja abaixo a lista das empresas vencedoras. (PG\/DB)<\/span><span  14px'><span  12px'>&nbsp;<\/span><\/span><\/p>\n<p><center><\/p>\n<table border='1' cellpadding='0' cellspacing='2' dir='ltr' width='517'>\n<tbody>\n<tr>\n<td bgcolor='#1f497d' height='25' valign='middle' width='14%'>\n<p>\n\t\t\t\t\t\t<span  16px'><b><font color='#ffffff' face='Verdana'><font color='#ffffff' face='Verdana'><font color='#ffffff' face='Verdana'>LOTE<\/font><\/font><\/font><\/b><\/span><\/p>\n<\/td>\n<td bgcolor='#1f497d' height='25' valign='middle' width='86%'>\n<p>\n\t\t\t\t\t\t<span  16px'><b><font color='#ffffff' face='Verdana'><font color='#ffffff' face='Verdana'><font color='#ffffff' face='Verdana'>VENCEDOR<\/font><\/font><\/font><\/b><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td bgcolor='#cdddac' height='14' width='14%'>\n<p>\n\t\t\t\t\t\t<span  14px'><b><font face='Verdana'><font face='Verdana'>A<\/font><\/font><\/b><\/span><\/p>\n<\/td>\n<td bgcolor='#cdddac' height='14' width='86%'>\n<p>\n\t\t\t\t\t\t<span  14px'><b><font face='Calibri'><font face='Calibri'>ABENGOA CONCESS&Otilde;ES BRASIL HOLDING S.A.<\/font><\/font><\/b><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td bgcolor='#e6eed5' height='18' width='14%'>\n<p>\n\t\t\t\t\t\t<span  14px'><b><font face='Verdana'><font face='Verdana'>B<\/font><\/font><\/b><\/span><\/p>\n<\/td>\n<td bgcolor='#e6eed5' height='18' width='86%'>\n<p>\n\t\t\t\t\t\t<span  14px'><b><font face='Calibri'><font face='Calibri'>COMPANHIA PARANAENSE DE ENERGIA<\/font><\/font><\/b><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td bgcolor='#cdddac' height='17' width='14%'>\n<p>\n\t\t\t\t\t\t<span  14px'><b><font face='Verdana'><font face='Verdana'>C<\/font><\/font><\/b><\/span><\/p>\n<\/td>\n<td bgcolor='#cdddac' height='17' width='86%'>\n<p>\n\t\t\t\t\t\t<span  14px'><b><font face='Calibri'><font face='Calibri'>CPFL GERA&Ccedil;&Atilde;O DE ENERGIA S.A<\/font><\/font><\/b><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td bgcolor='#e6eed5' height='17' width='14%'>\n<p>\n\t\t\t\t\t\t<span  14px'><b><font face='Verdana'><font face='Verdana'>E<\/font><\/font><\/b><\/span><\/p>\n<\/td>\n<td bgcolor='#e6eed5' height='17' width='86%'>\n<p>\n\t\t\t\t\t\t<span  14px'><b><font face='Calibri'><font face='Calibri'>ABENGOA CONCESS&Otilde;ES BRASIL HOLDING S.A<\/font><\/font><\/b><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td bgcolor='#cdddac' height='17' width='14%'>\n<p>\n\t\t\t\t\t\t<span  14px'><b><font face='Verdana'><font face='Verdana'>F<\/font><\/font><\/b><\/span><\/p>\n<\/td>\n<td bgcolor='#cdddac' height='17' width='86%'>\n<p>\n\t\t\t\t\t\t<span  14px'><b><font face='Calibri'><font face='Calibri'>ABENGOA CONCESS&Otilde;ES BRASIL HOLDING S.A<\/font><\/font><\/b><\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/center><\/p>\n<p>\n\t<span  14px'><span  12px'>&nbsp;* <strong>Receita Anual Permitida: <\/strong>Receita anual, resultante da oferta vencedora da licita&ccedil;&atilde;o, a que a concession&aacute;ria tem direito pela presta&ccedil;&atilde;o do servi&ccedil;o p&uacute;blico de transmiss&atilde;o a partir da entrada em opera&ccedil;&atilde;o comercial das instala&ccedil;&otilde;es de transmiss&atilde;o.<\/span><br \/>\n\t&nbsp;<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fonte: ANEEL &nbsp;&nbsp; Realizado em 21\/12\/12 na sede da BM&amp;FBOVESPA, em S&atilde;o Paulo, o leil&atilde;o terminou com 21,7% de des&aacute;gio. Ao todo, foram ofertados oito lotes, sendo que um deles, o lote H, n&atilde;o teve interessados e deve entrar nos pr&oacute;ximos leil&otilde;es a serem realizados pela Ag&ecirc;ncia. Foram licitadas 15 linhas de transmiss&atilde;o e oito [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[],"_links":{"self":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/10205"}],"collection":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10205"}],"version-history":[{"count":0,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=\/wp\/v2\/posts\/10205\/revisions"}],"wp:attachment":[{"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10205"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10205"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/sindenergia.com.br\/seminario\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10205"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}