Lot D is ended without proposals

Fonte: ANEEL

There were no parties interested in competing for Lot D, consisting of the transmission line 230 KV Barro Alto –Itapaci, located in Goiás, during Transmission Auction No. 01/2013, held by the Brazilian Electricity Regulatory Agency (ANEEL – Agência Nacional de Energia Elétrica) on this Friday (05/10). The lot shall enter the next events to be held by the Agency.

The purpose of the enterprise is to meet the load growth in the region. The prediction of startup in commercial operations is 22 months and it is expected to generate 125 direct jobs.

See in the CLIC Energia the auction result, per lot. (PG/DB)