Fonte: ANEEL
The Brazilian Electricity Regulatory Agency (ANEEL) approved at a public meeting the new limits for collective continuity indicators DEC* and FEC** for the sets of consumer units of the concessionaire Espírito Santo Power Plants (Escelsa), from the state of Espírito Santo. The limits were set for the years 2014-2016.
Check below the limits of indicators the Escelsa.
* Equivalent Interruption Duration per Consumer Unit – DEC –Average time Interval which, during the period of observation, each consumer unit in a set considered had discontinued electricity distribution. Refer to Module I do Prodist.
** Equivalent Interruption Frequency per Consumer Unit – FEC –Average number of interruptions, during the period of observation, in each consumer unit of the set considered. (JS)
Quality limits for ES distributor approved
Quality limits for ES distributor approved
Últimas notícias do seminário
Abertura
- 29 de junho de 2015
INSCRIÇÕES ENCERRADAS
- 16 de junho de 2015
PROGRAMAÇÃO
- 15 de junho de 2015
Inscrições Abertas !!!
- 15 de junho de 2015
Divulgação
- 9 de junho de 2015
Linha de Transmissão Marimbondo II ? Campinas obtém licença prévia do Ibama
- 15 de maio de 2015
CMSE: aumenta segurança no abastecimento de energia em maio
- 13 de maio de 2015