Fonte: ANEEL
The database for sending information to the Development Plan of Distribution (PDD), 2011 (version 1.0.11) is available for download. Agents must submit data annually to the Agency by April 10, as planned on Normative Resolution No. 395/2009, which approves the Distribution Procedures (Prodist).
The Plan presents the results of planning studies of electric and energy utilities and distribution licensees. ANEEL uses this information to monitor the planning and development of systems of power distribution in the country, and use them to assess possible needs for improving the regulations.
The database, along with the PDD-use instructions, is available on the Agency website at: Technical Info / Fees – Staff of Power Sector / Usage Rate of Distribution System / No attachment files for download. (DB/GL)