Public utility statements for five transmission projects

Fonte: ANEEL        
The Brazilian Electricity Regulatory Agency (ANEEL) has provided public utility statements, for purposes of easement, of approximately 270.6km of tracks of land for transmission projects in the states of Mato Grosso do Sul, Paraíba, and São Paulo.
        
The competence of the Agency to declare the public utility areas of land necessary for the implementation of generation, transmission and distribution projects is provided in Act 9074/1995, amended by Act 9648/1998. Normative Resolution 279/2007 governs the general procedures for application for declaration. See the areas that received the statements (FA/GL).

Company Project Location Extent of area declared
Companhia Hidro Elétrica do São Francisco (CHESF) Passage of two transmission line tracks in 138kV, in simple circuits, resulting from the sanctioning of LT 138kV Campina Grande II – Santa Cruz Municipalities of Algodão de Jandaíra, Remígio, Areia, Arara, Serraria, and Pilões, in Paraíba 35km
Companhia de Transmissão de Energia Elétrica Paulista (CTEEP) Sectioning of Transmission Line Botucatu – Edgard de Souza for connection to Substation Toyota Municipality of Sorocaba, in São Paulo 8.5km
Companhia de Transmissão de Energia Elétrica Paulista (CTEEP) Passage of Transmission Line Valparaíso – Nova Avanhandava, interconnecting substation Valparaíso – Nova Avanhandava Municipalities of Valparaíso, Bento de Abreu, Rubiácea, Guararapes, Araçatuba, Birigui, Coroados, Brejo Alegre, and Buritama, in São Paulo 93km
Eletrosul Centrais Elétricas S.A. (Eletrosul) Passage of transmission line São Domingos – Água Clara Municipality of Água Clara (MS) 53km
Energisa Paraíba Distribuidora de Energia S.A. (Energisa) Distribution line Campina Grande II – Juazeirinho Municipalities of Campina Grande, Soledade, Pocinhos, Juazeirinho, in Paraíba
 
 
81.1km