Fonte: ANEEL
Company Eletrosul Centrais Elétricas S/A is authorized by the National Energy Agency (ANEEL) to achieve reinforcement of their transmission facilities to improve care of energy supply in Santa Catarina. The decision came at a board meeting held today (05/17). The board authorized reinforcements in three transmission lines and substation. To pay for these investments, Eletrosul will be entitled to portions of the Annual Revenue Allowed (RAP)* of BRL 3.47 million. Check below the reinforcements and values of the RAP.
| Venture |
Value of the RAP
|
|
JOINVILLE Substation (SE) Complementation of the connection module, at 138 kilovolts (kV), of the TR5 138/69 kV – 33 MVA transformer, an atypical arrangement consisting of two bars, a circuit breaker and two switchgears. |
223,646.72 |
|
Palhoça – Jorge Lacerda Transmission line (LT) Isolation of TL 138 kV Palhoça / Jorge Lacerda A in the Garopaba SE. |
1,651,244.34 |
|
Palhoça – Imbituba LT Isolation of TL 138 kV Palhoça / Imbituba in the Palhoça Ribeira SE. |
964,168.36 |
|
Biguaçu – Tijucas LT – Camburiú Morro do Boi Isolation of SE Biguaçu 230/138 kV. |
639,621.93 |
| Total | 3,478,681.35 |