Fonte: ANEEL
The National Energy Agency (ANEEL) maintained the fines imposed on Companhia Estadual de Distribuição de Energia Elétrica– CEEE, on Copel Geração e Transmissão- COPEL – GT, Cemig Distribuição S/A – CEMIG D, Ampla Energia e Serviços S/A – AMPLAand Rio Grande Energia S/A – RGE. The fines imposed amounted to BRL 8.5 million and were due to noncompliance with the terms of the concession contract, breach of telemarketing indicators and rules of operation and maintenance of the substation (check below). The decision was made during the Board meeting held last Tuesday (06/14). (FA/DB)
Company | Infraction | Value of fine | Decision by ANEEL |
Ampla | Breach of concession contract and resolutions of ANEEL, in clauses concerning the application of energy rates to the Rural Electrification Cooperative of Resende Ltda.-CERES | BRL 690,192.32 | The Agency decided to hear and grant in part the appeal brought by the Ampla Energia e Serviços S.A. in face of Infraction No. 010/2011-SFE of 03/01/2011, drawn by the Superintendency of Electricity Services Inspection – SFE and establish the penalty of a fine |
CEEE-D | Breach of the quality of telephone service | BRL 640,007.35 | The Agency decided to hear and dismiss the appeal brought by the Companhia Estadual de Distribuição de Energia Elétrica – CEEE-D, in face of Infraction No. 062/2010-SFE, drawn by the Superintendency of Electricity Services Inspection – SFE |
CEMIG | Breach the limits set for the DEC continuity indicator in 2009 | BRL 6,411,899.78 | The Agency decided to hear and dismiss the appeal brought by Cemig Distribuição S.A. – CEMIG D, in face of Infraction No. 2/2011-SFE, drawn by the Superintendency of Electricity Services Inspection – SFE |
COPEL | Irregularities in operation procedures and maintenance of Substation –SE Umbará | BRL 223,707.14 | The Agency decided to hear and dismiss the appeal brought by COPEL-GT, in face of Infraction No. 6/2011-SFE, drawn by the Superintendency of Electricity Services Inspection – SFE |
RGE | Irregularities in data collection and assessment of indicators of individual and collective continuity (DEC/FEC) and the financial compensation due to consumers, or noncompliance with items 5.4, 5.5, 5.6 and 5.11 of section 8.2 of Module 8 of the relevant Distribution approved by Resolution No Ruling 395/2009 | BRL 590,634.43 | The Agency decided to hear and dismiss the appeal brought by Rio Grande Energia SA – RGE, in face of Infraction No. 9/2011-SFE, drawn by the Superintendency of Electricity Services Inspection – SFE |