Fonte: ANEEL
The National EnergyAgency (ANEEL) examined features of two companies against decisions of the Superintendency of Hydroenergetic Supervision and Studies (SGH).
Among the items contested by the company are the transfer of registration to carry out the Review of Hydroelectric Inventory Studies for inactive status and closure of a case for annulment of registration of feasibility studies or basic design, as provided for in Article 11 of ANEELResolution No. 395/1998.
The analysis was carried out during the public meeting of the board last Tuesday (11/01). The decision ends the possibility of appeal at the administrative level. Check the table below with details on the decision of the Board of ANEEL. (BT/GL).
COMPANY | REASON FOR APPEAL | ANEEL’S DECISION |
L&S Par Ltda. | Opposition to transfer to the inactive condition of registration to carry out the Review of Hydroelectric Inventory Studies of the Tocantinzinho river in the part upstream of the reservoir backwater of Hydro Power Plant (HPP) Mirado. | The Agency decided to learn and, on merit, dismiss the appeal by L&S Par. The determination of the Superintendency of Hydroenergetic Management and Studies (SGH) was maintained |
Duplo Onze – Sociedade Brasileira de Participações em Energia Renovável Ltda. e Armazéns Gerais Vale do Verde Ltda | Questioning by Duplo Onze – Sociedade Brasileira de Participações em Energia Renovável Ltda., about the filing of the registration cancellation process of feasibility studies or basic design, as provided for in Article 11 of ANEEL Resolution No. 395/1998, which would be applied to Armazéns Gerais Vale do Verde Ltda. Duplo Onze alleged that representatives of Armazéns Gerais Vale do Verde Ltda. would be making it difficult to prepare its basic project to SHP Patos. | The Agency decided to learn and, on merit, dismiss the appeal set up by Duplo Onze and Armazéns Gerais Vale do Verde Ltda. The determination of the Superintendency of Hydroenergetic Management and Studies (SGH) was maintained |