The society can participate in 7 public hearings in effect.

Fonte: ANEEL
In total, seven public hearings approved by the National Agency of Electric Energy (ANEEL) in 2012 remain open to receive contribuitions of energy consumers, agents and all the segments interested in participating in the discussions. The suggestions addressed are evaluated by the Agency’s technical areas, which draws up regulations and norms proposals to be submmited to the approval of the Board of Directors in the public meetings.

Subjescts such as suspension of payments owed by the energy distributors CELTINS (TO- Tocantins) e CEMAT (MT- Mato Grosso) of compensations due to the trespass of quality markers are in hearings, besides the bugdet of the Fossil fuel Cosume Bill- CCC for 2013.

The public hearing is a tool to support the decision process of the Agency, the wide consult of the society and preceeds the edition of norms and regulations. In many cases, the hearings can rely on the meetings for the presential manisfestation of the those interested. Other hearings are performed only through document exchange.

The contributions can be sent to the emails listed bellow, by fax: (61) 2192-8839 or to the Agency address (SGAN, Quadra 603, Módulo I, Térreo, Protocolo Geral, CEP: 70830-030), in Brasília (DF). Check bellow the list of public hearings open and the term for the contributions.

Hearing Subject Term E-mail
# 103/2012 Obtain subsides for the alteration in the proposal  of Contracts of Transmission System Use –CUST-, of  Tramission Services Rendering – CSPT and the Connection to the Transmission Installations – CCT, aiming to cancel the effect of the provisions which attribute responsibility for the indenization to the franchise holders and authorized companies of the the paid amounts as the refund for electric damages in consumers units according to the  Normative Resolution # 414, from September, 9, 2010. Until 01/30/2013 ap103_2012@aneel.gov.br
# 106/2012 Obtain subsides and additional information for the alteration of the article 8º, of the Normative Resolution # 467/2011, regulation which tackles the requirements and criteria for the alteration in the exploration system of the concessions of the hydrelectric usage to generate electric power aimed to public service. Until 01/14/2013 ap106_2012@aneel.gov.br
# 107/2012 Obtain subsides andadditionalinformation for the definition of the bugdet of the Fossil fuel Consume Bill- CCC for 2013. Until 01/21/2013 ap107_2012@aneel.gov.br
# 108/2012 Obtain subsides and additional information for the consolidation and updating of the general conditions of the electric power supply to the distributors with their own market below 500 GWh/year. Until 02/28/2013 ap108_2012@aneel.gov.br
# 109/2012 Obtain additional subsides to the proposal of suspension of payment, owed by CELTINS and CEMAT, related to compensations due to quality markers trespass as long as the intervention lasts. Until 01/21/2013 ap109_2012@aneel.gov.br
# 110/2012 Obtain subsides for the alteration proposal in the Normative Resolution # 411/2010, which refers to the auction of ajustment for the electric power purchase, established in the  § 3° of article 2° of the Law # 10.848/2004 and regulated by the articles 26 e 32 of the Statute # 5.163/2004. Until 01/21/2013 ap110_2012@aneel.gov.br
# 111/2012 Obtain subsides and additional information to regulate the calculation procedures related to the annual tax reajustment of the of the authorized companies of eletric power distribution and the finacial components pertinent, which are in Module 8 of the Tax Regulation Procedures – PRORET. Until 01/25/2013 ap111_2012@aneel.gov.br